以DB Netz AG的Kirchberg隧道为例,对砖石隧道进行翻新

P. Meyer, Ludwig Wiesmeier, Martin Jäntschke
{"title":"以DB Netz AG的Kirchberg隧道为例,对砖石隧道进行翻新","authors":"P. Meyer, Ludwig Wiesmeier, Martin Jäntschke","doi":"10.1002/geot.201700022","DOIUrl":null,"url":null,"abstract":"The finance available for the refurbishment of tunnels was around EUR 125 m. in 2014, which will increase to EUR 213 m. by 2018. DB Netz AG has a total of more than EUR 1 billion available in the medium term for the refurbishment of existing tunnels. This paper deals with the refurbishment of masonry tunnels of the DB Netz AG, Region South. The basis is the typical damage patterns of masonry tunnels, their causes and the possible refurbishment opportunities. On the Kirchberg Tunnel project, a feasibility study was carried out into possible repair measures. Based on the results of the study plans are now running. The article is supplemented by the latest state of the art rules for maintenance work in the area of tunnel construction at DB AG. The necessity of programmes for tunnelling, the necessary economic and operational constraints as well as experience with completed repairs to masonry tunnels conclude the article from the viewpoint of the owner and operator.","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"121 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Refurbishment of masonry tunnels through the example of the Kirchberg Tunnel for the DB Netz AG\",\"authors\":\"P. Meyer, Ludwig Wiesmeier, Martin Jäntschke\",\"doi\":\"10.1002/geot.201700022\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The finance available for the refurbishment of tunnels was around EUR 125 m. in 2014, which will increase to EUR 213 m. by 2018. DB Netz AG has a total of more than EUR 1 billion available in the medium term for the refurbishment of existing tunnels. This paper deals with the refurbishment of masonry tunnels of the DB Netz AG, Region South. The basis is the typical damage patterns of masonry tunnels, their causes and the possible refurbishment opportunities. On the Kirchberg Tunnel project, a feasibility study was carried out into possible repair measures. Based on the results of the study plans are now running. The article is supplemented by the latest state of the art rules for maintenance work in the area of tunnel construction at DB AG. The necessity of programmes for tunnelling, the necessary economic and operational constraints as well as experience with completed repairs to masonry tunnels conclude the article from the viewpoint of the owner and operator.\",\"PeriodicalId\":170042,\"journal\":{\"name\":\"Geomechanics and Tunnelling\",\"volume\":\"121 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geomechanics and Tunnelling\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/geot.201700022\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.201700022","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2014年可用于隧道翻新的资金约为1.25亿欧元,到2018年将增加到2.13亿欧元。德国铁路股份公司在中期有超过10亿欧元的资金用于现有隧道的翻新。本文研究了DB Netz AG公司南区砌体隧道的翻新工程。本文的基础是砌体隧道的典型破坏形式、原因和可能的翻新机会。在Kirchberg隧道项目上,对可能的修复措施进行了可行性研究。根据研究结果,目前正在运行研究计划。本文补充了德国铁路公司隧道施工领域最新的维修工作规则。隧道掘进方案的必要性,必要的经济和操作限制,以及砌体隧道完成维修的经验,从业主和运营商的角度总结了这篇文章。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Refurbishment of masonry tunnels through the example of the Kirchberg Tunnel for the DB Netz AG
The finance available for the refurbishment of tunnels was around EUR 125 m. in 2014, which will increase to EUR 213 m. by 2018. DB Netz AG has a total of more than EUR 1 billion available in the medium term for the refurbishment of existing tunnels. This paper deals with the refurbishment of masonry tunnels of the DB Netz AG, Region South. The basis is the typical damage patterns of masonry tunnels, their causes and the possible refurbishment opportunities. On the Kirchberg Tunnel project, a feasibility study was carried out into possible repair measures. Based on the results of the study plans are now running. The article is supplemented by the latest state of the art rules for maintenance work in the area of tunnel construction at DB AG. The necessity of programmes for tunnelling, the necessary economic and operational constraints as well as experience with completed repairs to masonry tunnels conclude the article from the viewpoint of the owner and operator.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信