{"title":"延迟与最后期限:伙伴关系中的搭便车与信息披露","authors":"Arthur Campbell, Florian Ederer, Johannes Spinnewijn","doi":"10.2139/ssrn.1906040","DOIUrl":null,"url":null,"abstract":"We study two sources of delay in teams: freeriding and lack of communication. Partners contribute to the value of a common project, but have private information about the success of their own efforts. When the deadline is far away, unsuccessful partners freeride on each others' efforts. When the deadline draws close, successful partners stop revealing their success to maintain their partners' motivation. We derive comparative statics results for common team performance measures and find that the optimal deadline maximizes productive efforts while avoiding unnecessary delays. Welfare is higher when information is only privately observable rather than revealed to the partnership.","PeriodicalId":235827,"journal":{"name":"ERN: Other Organizations & Markets: Decision-Making in Organizations (Topic)","volume":"171 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"52","resultStr":"{\"title\":\"Delay and Deadlines: Freeriding and Information Revelation in Partnerships\",\"authors\":\"Arthur Campbell, Florian Ederer, Johannes Spinnewijn\",\"doi\":\"10.2139/ssrn.1906040\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We study two sources of delay in teams: freeriding and lack of communication. Partners contribute to the value of a common project, but have private information about the success of their own efforts. When the deadline is far away, unsuccessful partners freeride on each others' efforts. When the deadline draws close, successful partners stop revealing their success to maintain their partners' motivation. We derive comparative statics results for common team performance measures and find that the optimal deadline maximizes productive efforts while avoiding unnecessary delays. Welfare is higher when information is only privately observable rather than revealed to the partnership.\",\"PeriodicalId\":235827,\"journal\":{\"name\":\"ERN: Other Organizations & Markets: Decision-Making in Organizations (Topic)\",\"volume\":\"171 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"52\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ERN: Other Organizations & Markets: Decision-Making in Organizations (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.1906040\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ERN: Other Organizations & Markets: Decision-Making in Organizations (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1906040","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 52

摘要

我们研究了团队延迟的两个来源:搭便车和缺乏沟通。合作伙伴为共同项目的价值做出贡献,但对自己的努力是否成功有自己的信息。当最后期限临近时,不成功的伴侣会搭上彼此努力的便车。当最后期限临近时,成功的伴侣会停止透露自己的成功,以保持伴侣的动力。我们为常见的团队绩效度量得出比较静态的结果,并发现最优的截止日期在避免不必要的延迟的同时最大化了生产努力。当信息只在私下可见而不是向合伙企业披露时,福利会更高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Delay and Deadlines: Freeriding and Information Revelation in Partnerships
We study two sources of delay in teams: freeriding and lack of communication. Partners contribute to the value of a common project, but have private information about the success of their own efforts. When the deadline is far away, unsuccessful partners freeride on each others' efforts. When the deadline draws close, successful partners stop revealing their success to maintain their partners' motivation. We derive comparative statics results for common team performance measures and find that the optimal deadline maximizes productive efforts while avoiding unnecessary delays. Welfare is higher when information is only privately observable rather than revealed to the partnership.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信