{"title":"Peringkat Dan Penanganan Risiko Dominan Konstruksi Design And Build Jalan Tol Pada Pekerjaan Proyek Trans Sumatera Ruas Simpang Indralaya–Muara Enim Seksi Simpang Indralaya – Prabumulih","authors":"Rifqi Auzan Nurtsani","doi":"10.54543/etnik.v2i4.183","DOIUrl":null,"url":null,"abstract":" Prabumulih used thirty variables from the results of previous research which were then validated with experts and became a total of thirty-three variables. On these variables, interviews were conducted with respondents. The interview results were analyzed using spss and ranked based on the risk analysis. The results are then thrown back to the respondents for category risk mitigation (unacceptabrle). From these results, there are seven dominant risks. From these results, there are seven dominant risks. The dominant risk is divided into three categories, namely owner factors, implementing team factors and external factors that affect the Construction Design And Build of Toll Roads in Trans Sumatra Project Work Simpang Indralaya – Muara Enim Section Simpang Indralaya – Prabumulih Section\n ","PeriodicalId":380922,"journal":{"name":"ETNIK: Jurnal Ekonomi dan Teknik","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ETNIK: Jurnal Ekonomi dan Teknik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54543/etnik.v2i4.183","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Prabumulih从之前的研究结果中使用了30个变量,然后经过专家的验证,成为总共33个变量。在这些变量上,与受访者进行了访谈。访谈结果采用spss进行分析,并根据风险分析进行排序。然后将结果退回给应答者,以减轻类别风险(不可接受)。从这些结果来看,有七个主要风险。从这些结果来看,有七个主要风险。将主导风险分为三大类,即业主因素、实施团队因素和影响跨苏门答腊工程收费公路施工设计与施工的外部因素
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Peringkat Dan Penanganan Risiko Dominan Konstruksi Design And Build Jalan Tol Pada Pekerjaan Proyek Trans Sumatera Ruas Simpang Indralaya–Muara Enim Seksi Simpang Indralaya – Prabumulih
 Prabumulih used thirty variables from the results of previous research which were then validated with experts and became a total of thirty-three variables. On these variables, interviews were conducted with respondents. The interview results were analyzed using spss and ranked based on the risk analysis. The results are then thrown back to the respondents for category risk mitigation (unacceptabrle). From these results, there are seven dominant risks. From these results, there are seven dominant risks. The dominant risk is divided into three categories, namely owner factors, implementing team factors and external factors that affect the Construction Design And Build of Toll Roads in Trans Sumatra Project Work Simpang Indralaya – Muara Enim Section Simpang Indralaya – Prabumulih Section  
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信