“WAMS East”为2003年8月14日东北地区停电提供动态信息的表现

J. Hauer, N. Bhatt, K. Shah, S. Kolluri
{"title":"“WAMS East”为2003年8月14日东北地区停电提供动态信息的表现","authors":"J. Hauer, N. Bhatt, K. Shah, S. Kolluri","doi":"10.1109/PES.2004.1373161","DOIUrl":null,"url":null,"abstract":"The blackout that impacted the U.S. and Canada on August 14, 2003, was notable for its extent, complexity, and impact. It triggered a massive review of operating records to determine what happened, why it happened, and how to avoid it in future operations. Much of this work was done at NERC level, through the U.S.-Canada power system outage task force. Additional background information concerning the event was gathered together by a group of utilities that, collectively, have been developing a wide area measurement system (WAMS) for the eastern interconnection. Like its counterpart in the western interconnection, \"WAMS East\" has a primary backbone of synchronized phasor measurements that are continuously recorded at central locations. Operational data have been critical for understanding and responding to the August 14 blackout. Records collected on WAMS East demonstrate the contributions that well synchronized data offer in such efforts, and the value of strategically located continuous recording systems to facilitate their integration. This work examines overall performance of the WAMS East backbone, with a brief assessment of the technology involved. Later papers will provide a utility view of the NERC data review and its institutional implications.","PeriodicalId":236779,"journal":{"name":"IEEE Power Engineering Society General Meeting, 2004.","volume":"108 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"77","resultStr":"{\"title\":\"Performance of \\\"WAMS East\\\" in providing dynamic information for the North East blackout of August 14, 2003\",\"authors\":\"J. Hauer, N. Bhatt, K. Shah, S. Kolluri\",\"doi\":\"10.1109/PES.2004.1373161\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The blackout that impacted the U.S. and Canada on August 14, 2003, was notable for its extent, complexity, and impact. It triggered a massive review of operating records to determine what happened, why it happened, and how to avoid it in future operations. Much of this work was done at NERC level, through the U.S.-Canada power system outage task force. Additional background information concerning the event was gathered together by a group of utilities that, collectively, have been developing a wide area measurement system (WAMS) for the eastern interconnection. Like its counterpart in the western interconnection, \\\"WAMS East\\\" has a primary backbone of synchronized phasor measurements that are continuously recorded at central locations. Operational data have been critical for understanding and responding to the August 14 blackout. Records collected on WAMS East demonstrate the contributions that well synchronized data offer in such efforts, and the value of strategically located continuous recording systems to facilitate their integration. This work examines overall performance of the WAMS East backbone, with a brief assessment of the technology involved. Later papers will provide a utility view of the NERC data review and its institutional implications.\",\"PeriodicalId\":236779,\"journal\":{\"name\":\"IEEE Power Engineering Society General Meeting, 2004.\",\"volume\":\"108 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-06-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"77\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Power Engineering Society General Meeting, 2004.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2004.1373161\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society General Meeting, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2004.1373161","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 77

摘要

2003年8月14日影响美国和加拿大的停电事件因其范围、复杂性和影响而引人注目。它引发了对操作记录的大规模审查,以确定发生了什么,为什么会发生,以及如何在未来的操作中避免它。大部分工作都是通过美国-加拿大电力系统停电工作组在NERC层面完成的。有关该事件的其他背景资料是由一组公用事业公司收集的,这些公用事业公司共同为东部互联开发了一个广域测量系统(WAMS)。与西部互联系统类似,“WAMS东部”有同步相量测量的主干网,在中心位置连续记录。运营数据对于理解和应对8月14日的停电至关重要。在WAMS East上收集的记录证明了良好同步的数据在这些工作中提供的贡献,以及战略性位置的连续记录系统对促进其集成的价值。这项工作考察了WAMS东部主干网的整体性能,并对所涉及的技术进行了简要评估。以后的论文将提供NERC数据审查的实用观点及其制度意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Performance of "WAMS East" in providing dynamic information for the North East blackout of August 14, 2003
The blackout that impacted the U.S. and Canada on August 14, 2003, was notable for its extent, complexity, and impact. It triggered a massive review of operating records to determine what happened, why it happened, and how to avoid it in future operations. Much of this work was done at NERC level, through the U.S.-Canada power system outage task force. Additional background information concerning the event was gathered together by a group of utilities that, collectively, have been developing a wide area measurement system (WAMS) for the eastern interconnection. Like its counterpart in the western interconnection, "WAMS East" has a primary backbone of synchronized phasor measurements that are continuously recorded at central locations. Operational data have been critical for understanding and responding to the August 14 blackout. Records collected on WAMS East demonstrate the contributions that well synchronized data offer in such efforts, and the value of strategically located continuous recording systems to facilitate their integration. This work examines overall performance of the WAMS East backbone, with a brief assessment of the technology involved. Later papers will provide a utility view of the NERC data review and its institutional implications.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信