Abdullah Rizky Agusman, Aly Rasyid, Dika Latief Lesmana
{"title":"Evaluasi Water Shut Off Dan Membuka Lapisan Baru Sumur Bagong Di Lapangan Lesma","authors":"Abdullah Rizky Agusman, Aly Rasyid, Dika Latief Lesmana","doi":"10.31599/bpe.v1i1.1013","DOIUrl":null,"url":null,"abstract":"Evaluation of Water Shut Off and Opening a New Layer of the Bagong Well in the Lesma Field, In oil and gas exploitation activities at the Bg01 Well, the well has been in production for a long time, so there is a problem where the proportion of water content in production wells continues to increase. compared to the proportion of oil and gas content produced, the improvement is carried out using the water shut off method by closing the existing perforation holes and opening new perforations in the same layer. Or closing the existing perforation holes that are indicated to cause an increase in water and the production of other perforated parts. By closing the layer, it is hoped that the water cut will decrease so that it will increase oil and gas production.","PeriodicalId":192894,"journal":{"name":"JURNAL BHARA PETRO ENERGI","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL BHARA PETRO ENERGI","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31599/bpe.v1i1.1013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

Lesma油田巴公井关水开新层评价在Bg01井的油气开发活动中,该井投产时间较长,存在生产井含水率持续增加的问题。与产出的油气含量比例相比,采用关水方法通过关闭现有射孔并在同一层中打开新射孔来进行改进。或者关闭现有的穿孔孔,这些穿孔孔会导致水的增加和其他穿孔部件的生产。通过关闭该层,希望能降低含水率,从而提高油气产量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluasi Water Shut Off Dan Membuka Lapisan Baru Sumur Bagong Di Lapangan Lesma
Evaluation of Water Shut Off and Opening a New Layer of the Bagong Well in the Lesma Field, In oil and gas exploitation activities at the Bg01 Well, the well has been in production for a long time, so there is a problem where the proportion of water content in production wells continues to increase. compared to the proportion of oil and gas content produced, the improvement is carried out using the water shut off method by closing the existing perforation holes and opening new perforations in the same layer. Or closing the existing perforation holes that are indicated to cause an increase in water and the production of other perforated parts. By closing the layer, it is hoped that the water cut will decrease so that it will increase oil and gas production.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信