{"title":"大型海上风电集成拓扑结构优化技术要求研究","authors":"Yan Li, Xin-shou Tian, Bin Yuan, Y. Chi, Guanglie Li, Ruanming Huang, Shuai Liang, Ting Huang, Mengyao Zhang","doi":"10.1109/HVDC50696.2020.9292773","DOIUrl":null,"url":null,"abstract":"The transmission of offshore wind farms faces the problem of shortage of transmission corridor resources. It is necessary to consider how wind farm clusters are densely connected to the power grid. The design of the topology needs to be further optimized, and the power supply layout and grid structure need to be analyzed during the planning and construction period of the grid. Therefore, this paper analyzes the study requirement for the optimization of the topology of the offshore wind power AC / DC connect to grid. When the wind farm is close to the land and distributed, the AC integration can be used and the connect points are distributed in the power grid to reduce the impact of wind power fluctuations on the AC power grid.","PeriodicalId":298807,"journal":{"name":"2020 4th International Conference on HVDC (HVDC)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Study on Topology Structure Optimization Technology Requirements for Large-scale Offshore Wind Power Integration\",\"authors\":\"Yan Li, Xin-shou Tian, Bin Yuan, Y. Chi, Guanglie Li, Ruanming Huang, Shuai Liang, Ting Huang, Mengyao Zhang\",\"doi\":\"10.1109/HVDC50696.2020.9292773\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The transmission of offshore wind farms faces the problem of shortage of transmission corridor resources. It is necessary to consider how wind farm clusters are densely connected to the power grid. The design of the topology needs to be further optimized, and the power supply layout and grid structure need to be analyzed during the planning and construction period of the grid. Therefore, this paper analyzes the study requirement for the optimization of the topology of the offshore wind power AC / DC connect to grid. When the wind farm is close to the land and distributed, the AC integration can be used and the connect points are distributed in the power grid to reduce the impact of wind power fluctuations on the AC power grid.\",\"PeriodicalId\":298807,\"journal\":{\"name\":\"2020 4th International Conference on HVDC (HVDC)\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-11-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 4th International Conference on HVDC (HVDC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HVDC50696.2020.9292773\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 4th International Conference on HVDC (HVDC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HVDC50696.2020.9292773","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

海上风电场的输电面临着输电走廊资源短缺的问题。有必要考虑风力发电场集群如何与电网紧密相连。在电网规划建设期间,需要对拓扑的设计进行进一步优化,对电源布局和电网结构进行分析。因此,本文分析了海上风电交/直流并网拓扑优化的研究需求。当风电场靠近陆地且分布时,可采用交流集成,并将接点分布在电网中,以减少风电波动对交流电网的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study on Topology Structure Optimization Technology Requirements for Large-scale Offshore Wind Power Integration
The transmission of offshore wind farms faces the problem of shortage of transmission corridor resources. It is necessary to consider how wind farm clusters are densely connected to the power grid. The design of the topology needs to be further optimized, and the power supply layout and grid structure need to be analyzed during the planning and construction period of the grid. Therefore, this paper analyzes the study requirement for the optimization of the topology of the offshore wind power AC / DC connect to grid. When the wind farm is close to the land and distributed, the AC integration can be used and the connect points are distributed in the power grid to reduce the impact of wind power fluctuations on the AC power grid.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信