{"title":"基于芬兰400kv输电网PMU测量的次同步阻尼测定","authors":"T. Rauhala, K. Saarinen, P. Vuorenpaa, P. Jarventausta","doi":"10.1109/PCT.2007.4538571","DOIUrl":null,"url":null,"abstract":"In May 2006 two Phasor Measurement Units were installed in Finnish 400 kV transmission grid in order to study subsynchronous damping of 950 MVA generating unit located geographically close to 550 MW HVDC transmission system. Subsynchronous damping was analyzed based on post- disturbance data measured using PMU. In this paper the background of the study and the main results from the measurements over period between May 2006 and August 2006 are presented. The quality of measured subsynchronous oscillations is illustrated and the validity of approach on subsynchronous damping estimation is discussed based on the measurements. Also, amplitude of measured subsynchronous components related to different system disturbances are illustrated and the values determined for total subsynchronous damping based on the post-disturbance measurements are presented. Finally, the possibilities to use PMU output data for real-time monitoring of subsynchronous damping is discussed based on the obtained experiences.","PeriodicalId":356805,"journal":{"name":"2007 IEEE Lausanne Power Tech","volume":"93 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Determining Subsynchronous Damping Based on PMU Measurements from Finnish 400 kV Transmission Network\",\"authors\":\"T. Rauhala, K. Saarinen, P. Vuorenpaa, P. Jarventausta\",\"doi\":\"10.1109/PCT.2007.4538571\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In May 2006 two Phasor Measurement Units were installed in Finnish 400 kV transmission grid in order to study subsynchronous damping of 950 MVA generating unit located geographically close to 550 MW HVDC transmission system. Subsynchronous damping was analyzed based on post- disturbance data measured using PMU. In this paper the background of the study and the main results from the measurements over period between May 2006 and August 2006 are presented. The quality of measured subsynchronous oscillations is illustrated and the validity of approach on subsynchronous damping estimation is discussed based on the measurements. Also, amplitude of measured subsynchronous components related to different system disturbances are illustrated and the values determined for total subsynchronous damping based on the post-disturbance measurements are presented. Finally, the possibilities to use PMU output data for real-time monitoring of subsynchronous damping is discussed based on the obtained experiences.\",\"PeriodicalId\":356805,\"journal\":{\"name\":\"2007 IEEE Lausanne Power Tech\",\"volume\":\"93 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Lausanne Power Tech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PCT.2007.4538571\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Lausanne Power Tech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCT.2007.4538571","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

2006年5月,芬兰400千伏输电网安装了两个相量测量装置,以研究位于550兆瓦高压直流输电系统附近的950 MVA发电机组的次同步阻尼。基于PMU测得的扰动后数据,分析了系统的次同步阻尼。本文介绍了研究的背景和2006年5月至2006年8月期间测量的主要结果。说明了测量的次同步振荡的质量,并根据测量结果讨论了该方法估计次同步阻尼的有效性。此外,还说明了与不同系统扰动相关的测量次同步分量的幅值,并给出了基于扰动后测量确定的总次同步阻尼的值。最后,根据获得的经验,讨论了利用PMU输出数据实时监测次同步阻尼的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Determining Subsynchronous Damping Based on PMU Measurements from Finnish 400 kV Transmission Network
In May 2006 two Phasor Measurement Units were installed in Finnish 400 kV transmission grid in order to study subsynchronous damping of 950 MVA generating unit located geographically close to 550 MW HVDC transmission system. Subsynchronous damping was analyzed based on post- disturbance data measured using PMU. In this paper the background of the study and the main results from the measurements over period between May 2006 and August 2006 are presented. The quality of measured subsynchronous oscillations is illustrated and the validity of approach on subsynchronous damping estimation is discussed based on the measurements. Also, amplitude of measured subsynchronous components related to different system disturbances are illustrated and the values determined for total subsynchronous damping based on the post-disturbance measurements are presented. Finally, the possibilities to use PMU output data for real-time monitoring of subsynchronous damping is discussed based on the obtained experiences.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信