{"title":"在联机条件下用OPGW替换现有接地线,在Olsztyn新建训练多边形","authors":"G. Kochan, K. Lenarczyk, K. Kiczkajlo, B. Dudek","doi":"10.1109/ICOLIM.2014.6934332","DOIUrl":null,"url":null,"abstract":"Replacement of existing ground wires with OPGW under live-line conditions. This paper describes methods and examples of building fibre optics tract by different existing and actual methods on energized transmission line abroad and in Poland. In addition, an analysis of electromagnetic field induction from existing and nearby energized line when OPGW is being installed is presented. The paper also presents a newly built training polygon in Olsztyn for secure operation practice.","PeriodicalId":238060,"journal":{"name":"2014 11th International Conference on Live Maintenance (ICOLIM)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Replacement of existing ground wire with OPGW under live-line conditions new training polygon in Olsztyn\",\"authors\":\"G. Kochan, K. Lenarczyk, K. Kiczkajlo, B. Dudek\",\"doi\":\"10.1109/ICOLIM.2014.6934332\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Replacement of existing ground wires with OPGW under live-line conditions. This paper describes methods and examples of building fibre optics tract by different existing and actual methods on energized transmission line abroad and in Poland. In addition, an analysis of electromagnetic field induction from existing and nearby energized line when OPGW is being installed is presented. The paper also presents a newly built training polygon in Olsztyn for secure operation practice.\",\"PeriodicalId\":238060,\"journal\":{\"name\":\"2014 11th International Conference on Live Maintenance (ICOLIM)\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-05-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 11th International Conference on Live Maintenance (ICOLIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICOLIM.2014.6934332\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 11th International Conference on Live Maintenance (ICOLIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICOLIM.2014.6934332","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Replacement of existing ground wire with OPGW under live-line conditions new training polygon in Olsztyn
Replacement of existing ground wires with OPGW under live-line conditions. This paper describes methods and examples of building fibre optics tract by different existing and actual methods on energized transmission line abroad and in Poland. In addition, an analysis of electromagnetic field induction from existing and nearby energized line when OPGW is being installed is presented. The paper also presents a newly built training polygon in Olsztyn for secure operation practice.