基于霍尔三维结构的铁路建设项目成本控制研究

Lixing Lou, Yilin Yin
{"title":"基于霍尔三维结构的铁路建设项目成本控制研究","authors":"Lixing Lou, Yilin Yin","doi":"10.1109/ICLSIM.2010.5461314","DOIUrl":null,"url":null,"abstract":"The phenomena of exceeding budgetary estimate often occur during the process of railway construction, which requires cost control strengthened. The purpose of this paper is to explore the way of cost control systematically. A model of cost control based on Hall Three-Dimensional Structure is proposed, which include stage divided, the problems and solutions of cost control at every stage, the knowledge required from the viewpoint of system.","PeriodicalId":249102,"journal":{"name":"2010 International Conference on Logistics Systems and Intelligent Management (ICLSIM)","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Study on cost control of railway construction project based on Hall Three-Dimensional Structure\",\"authors\":\"Lixing Lou, Yilin Yin\",\"doi\":\"10.1109/ICLSIM.2010.5461314\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The phenomena of exceeding budgetary estimate often occur during the process of railway construction, which requires cost control strengthened. The purpose of this paper is to explore the way of cost control systematically. A model of cost control based on Hall Three-Dimensional Structure is proposed, which include stage divided, the problems and solutions of cost control at every stage, the knowledge required from the viewpoint of system.\",\"PeriodicalId\":249102,\"journal\":{\"name\":\"2010 International Conference on Logistics Systems and Intelligent Management (ICLSIM)\",\"volume\":\"20 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-05-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference on Logistics Systems and Intelligent Management (ICLSIM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICLSIM.2010.5461314\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference on Logistics Systems and Intelligent Management (ICLSIM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICLSIM.2010.5461314","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

铁路建设过程中经常出现超预算的现象,需要加强成本控制。本文旨在系统地探讨成本控制的途径。提出了一种基于霍尔三维结构的成本控制模型,该模型包括阶段划分、各阶段成本控制存在的问题及解决方案、系统视角下成本控制所需的知识。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study on cost control of railway construction project based on Hall Three-Dimensional Structure
The phenomena of exceeding budgetary estimate often occur during the process of railway construction, which requires cost control strengthened. The purpose of this paper is to explore the way of cost control systematically. A model of cost control based on Hall Three-Dimensional Structure is proposed, which include stage divided, the problems and solutions of cost control at every stage, the knowledge required from the viewpoint of system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信