确定如何以及何时执行螺栓法兰连接的单螺柱更换(SSR)

Clay D. Rodery, S. Hamilton, N. Ferguson, G. Jung
{"title":"确定如何以及何时执行螺栓法兰连接的单螺柱更换(SSR)","authors":"Clay D. Rodery, S. Hamilton, N. Ferguson, G. Jung","doi":"10.1115/pvp2019-93687","DOIUrl":null,"url":null,"abstract":"\n Single Stud Replacement (SSR), or as currently known in ASME PCC-2 as “Hot Bolting” is the removal and replacement of studs on a bolted joint on a one at a time basis in a predetermined sequence. One of the key aspects in the successful execution of this activity is the determination of the appropriate maximum pressure governing the operation. The guidance currently provided in ASME PCC-2 is somewhat arbitrary and vague, and some clearer definition of a technical basis in this area would be valuable to industry in terms of both productivity and safety.\n To provide additional clarity to this activity, a Task Group within the ASME Post Construction Subcommittee on Flanged Joint Assembly is redrafting the article detailing procedures for Single Stud Replacement. This paper discusses the work and focuses on the task of determining and documenting a technical basis for setting the limits (e.g., maximum pressure, effects of external moments, etc.) to safely execute a Single Stud Replacement operation.","PeriodicalId":150804,"journal":{"name":"Volume 3: Design and Analysis","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Defining the How and When to Execute Single Stud Replacement (SSR) of Bolted Flanged Joints\",\"authors\":\"Clay D. Rodery, S. Hamilton, N. Ferguson, G. Jung\",\"doi\":\"10.1115/pvp2019-93687\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n Single Stud Replacement (SSR), or as currently known in ASME PCC-2 as “Hot Bolting” is the removal and replacement of studs on a bolted joint on a one at a time basis in a predetermined sequence. One of the key aspects in the successful execution of this activity is the determination of the appropriate maximum pressure governing the operation. The guidance currently provided in ASME PCC-2 is somewhat arbitrary and vague, and some clearer definition of a technical basis in this area would be valuable to industry in terms of both productivity and safety.\\n To provide additional clarity to this activity, a Task Group within the ASME Post Construction Subcommittee on Flanged Joint Assembly is redrafting the article detailing procedures for Single Stud Replacement. This paper discusses the work and focuses on the task of determining and documenting a technical basis for setting the limits (e.g., maximum pressure, effects of external moments, etc.) to safely execute a Single Stud Replacement operation.\",\"PeriodicalId\":150804,\"journal\":{\"name\":\"Volume 3: Design and Analysis\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Volume 3: Design and Analysis\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1115/pvp2019-93687\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 3: Design and Analysis","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/pvp2019-93687","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

单螺柱更换(SSR),或目前在ASME PCC-2中称为“热螺栓连接”,是在预定顺序的基础上一次拆除和更换螺栓连接上的螺柱。成功执行这一活动的关键方面之一是确定控制操作的适当最大压力。目前在ASME pc -2中提供的指导有些武断和模糊,在这一领域对技术基础的一些更清晰的定义将在生产力和安全性方面对工业有价值。为了进一步明确这一活动,美国机械工程师协会(ASME)法兰连接装配后小组委员会的一个任务小组正在重新起草详细说明单螺柱更换程序的文章。本文讨论了这项工作,并着重于确定和记录设置极限的技术基础(例如,最大压力,外部力矩的影响等),以安全执行单个螺柱更换操作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Defining the How and When to Execute Single Stud Replacement (SSR) of Bolted Flanged Joints
Single Stud Replacement (SSR), or as currently known in ASME PCC-2 as “Hot Bolting” is the removal and replacement of studs on a bolted joint on a one at a time basis in a predetermined sequence. One of the key aspects in the successful execution of this activity is the determination of the appropriate maximum pressure governing the operation. The guidance currently provided in ASME PCC-2 is somewhat arbitrary and vague, and some clearer definition of a technical basis in this area would be valuable to industry in terms of both productivity and safety. To provide additional clarity to this activity, a Task Group within the ASME Post Construction Subcommittee on Flanged Joint Assembly is redrafting the article detailing procedures for Single Stud Replacement. This paper discusses the work and focuses on the task of determining and documenting a technical basis for setting the limits (e.g., maximum pressure, effects of external moments, etc.) to safely execute a Single Stud Replacement operation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信