{"title":"应用于运行中的风电场的服役老化中压电力电缆的测试方法","authors":"M. Moore","doi":"10.1109/EIC.2011.5996191","DOIUrl":null,"url":null,"abstract":"As wind turbines quickly spread throughout the USA, many wind generation sites were designed, developed and installed very quickly and not always with long term dependability in mind. This review of cable testing methods used in both acceptance testing and annual maintenance practices will discuss the strengths and weaknesses of the various methodologies in wind farm applications. Also discussed will be a method for a time based approach to cable maintenance testing and how to develop standards and qualify personnel for the procedures.","PeriodicalId":129127,"journal":{"name":"2011 Electrical Insulation Conference (EIC).","volume":"50 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"The testing methodologies of service aged medium voltage power cables as applied to an operating wind farm\",\"authors\":\"M. Moore\",\"doi\":\"10.1109/EIC.2011.5996191\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As wind turbines quickly spread throughout the USA, many wind generation sites were designed, developed and installed very quickly and not always with long term dependability in mind. This review of cable testing methods used in both acceptance testing and annual maintenance practices will discuss the strengths and weaknesses of the various methodologies in wind farm applications. Also discussed will be a method for a time based approach to cable maintenance testing and how to develop standards and qualify personnel for the procedures.\",\"PeriodicalId\":129127,\"journal\":{\"name\":\"2011 Electrical Insulation Conference (EIC).\",\"volume\":\"50 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-06-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 Electrical Insulation Conference (EIC).\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EIC.2011.5996191\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Electrical Insulation Conference (EIC).","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EIC.2011.5996191","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
The testing methodologies of service aged medium voltage power cables as applied to an operating wind farm
As wind turbines quickly spread throughout the USA, many wind generation sites were designed, developed and installed very quickly and not always with long term dependability in mind. This review of cable testing methods used in both acceptance testing and annual maintenance practices will discuss the strengths and weaknesses of the various methodologies in wind farm applications. Also discussed will be a method for a time based approach to cable maintenance testing and how to develop standards and qualify personnel for the procedures.