{"title":"基于最优储备决策的风电系统风险约束机组承诺迭代修正方法","authors":"Ying Qiao, Yisha Lin, Haibo Li, Xuebin Wang","doi":"10.1109/CPEEE51686.2021.9383418","DOIUrl":null,"url":null,"abstract":"The operation risk may increase with the high penetration of wind power, but the calculation of risk indices is complex and nonlinear, which makes it difficult to incorporate the risk constraints into the conventional unit commitment (UC) model. This paper focuses on accurately handling the risk constraints instead of approximate exponential decay rules, and proposes an iteration-correction methodology to solve risked-constrained UC of power systems with wind power. The proposed method calculates the risk indices based on the PJM method, and modifies the minimum reserve demand in each iterative step if the risk indices exceed the limits. A dynamic iterative speed-up equation is given to decrease the elapsed time. The case studies based on the actual system of China are conducted to validate the effectiveness. Compared with the conventional reserve limit, the precise and optimal reserve decision is made under different risk levels, and the proposed UC has merits of less cost and lower risk.","PeriodicalId":314015,"journal":{"name":"2021 11th International Conference on Power, Energy and Electrical Engineering (CPEEE)","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-02-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Iterative-Correction Approach of Risk-Constrained Unit Commitment of Power Systems with Wind Power based on Optimal Reserve Decision\",\"authors\":\"Ying Qiao, Yisha Lin, Haibo Li, Xuebin Wang\",\"doi\":\"10.1109/CPEEE51686.2021.9383418\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The operation risk may increase with the high penetration of wind power, but the calculation of risk indices is complex and nonlinear, which makes it difficult to incorporate the risk constraints into the conventional unit commitment (UC) model. This paper focuses on accurately handling the risk constraints instead of approximate exponential decay rules, and proposes an iteration-correction methodology to solve risked-constrained UC of power systems with wind power. The proposed method calculates the risk indices based on the PJM method, and modifies the minimum reserve demand in each iterative step if the risk indices exceed the limits. A dynamic iterative speed-up equation is given to decrease the elapsed time. The case studies based on the actual system of China are conducted to validate the effectiveness. Compared with the conventional reserve limit, the precise and optimal reserve decision is made under different risk levels, and the proposed UC has merits of less cost and lower risk.\",\"PeriodicalId\":314015,\"journal\":{\"name\":\"2021 11th International Conference on Power, Energy and Electrical Engineering (CPEEE)\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-02-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 11th International Conference on Power, Energy and Electrical Engineering (CPEEE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPEEE51686.2021.9383418\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 11th International Conference on Power, Energy and Electrical Engineering (CPEEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPEEE51686.2021.9383418","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

随着风电装机容量的增大,运行风险也随之增大,但风险指标的计算具有复杂性和非线性,难以将风险约束纳入常规的机组承诺(UC)模型。本文着眼于精确处理风险约束,而不是近似的指数衰减规则,提出了一种迭代修正方法来求解风电系统的风险约束UC。该方法基于PJM方法计算风险指数,并在风险指数超过极限时修改每个迭代步骤的最小储备需求。给出了一个动态迭代加速方程,以减少运行时间。基于中国实际系统的案例分析验证了该方法的有效性。与常规储备限额相比,在不同风险水平下进行了精确、最优的储备决策,具有成本低、风险小的优点。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
An Iterative-Correction Approach of Risk-Constrained Unit Commitment of Power Systems with Wind Power based on Optimal Reserve Decision
The operation risk may increase with the high penetration of wind power, but the calculation of risk indices is complex and nonlinear, which makes it difficult to incorporate the risk constraints into the conventional unit commitment (UC) model. This paper focuses on accurately handling the risk constraints instead of approximate exponential decay rules, and proposes an iteration-correction methodology to solve risked-constrained UC of power systems with wind power. The proposed method calculates the risk indices based on the PJM method, and modifies the minimum reserve demand in each iterative step if the risk indices exceed the limits. A dynamic iterative speed-up equation is given to decrease the elapsed time. The case studies based on the actual system of China are conducted to validate the effectiveness. Compared with the conventional reserve limit, the precise and optimal reserve decision is made under different risk levels, and the proposed UC has merits of less cost and lower risk.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信