N. Nifontov, A. Maltsev, N. Vikulin, P. Ten, Nikolay Torsunov
{"title":"世界上最长的DTS电缆用于ESP下的永久监测——西西伯利亚油井ESP系统监测的成功解决方案——案例研究","authors":"N. Nifontov, A. Maltsev, N. Vikulin, P. Ten, Nikolay Torsunov","doi":"10.2118/212094-ms","DOIUrl":null,"url":null,"abstract":"\n This article describes evolution of well design concept for Vikulovskaya oil rim reservoir development with no possibility for fracking and first World's longest application of permanent monitoring solution for appraisal multilateral well with the access to the wellbore restricted by presence of ESP pump in West Siberia inside 7″ casing and 4.5″ production liner Horizontal Multilateral well.","PeriodicalId":394241,"journal":{"name":"Day 1 Tue, November 15, 2022","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"World's Longest DTS Cable Run for Permanent Monitoring Below ESP - A Successful Solution for West Siberian Wells Surveillance with ESP Systems - Case Study\",\"authors\":\"N. Nifontov, A. Maltsev, N. Vikulin, P. Ten, Nikolay Torsunov\",\"doi\":\"10.2118/212094-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n This article describes evolution of well design concept for Vikulovskaya oil rim reservoir development with no possibility for fracking and first World's longest application of permanent monitoring solution for appraisal multilateral well with the access to the wellbore restricted by presence of ESP pump in West Siberia inside 7″ casing and 4.5″ production liner Horizontal Multilateral well.\",\"PeriodicalId\":394241,\"journal\":{\"name\":\"Day 1 Tue, November 15, 2022\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, November 15, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/212094-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, November 15, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/212094-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
World's Longest DTS Cable Run for Permanent Monitoring Below ESP - A Successful Solution for West Siberian Wells Surveillance with ESP Systems - Case Study
This article describes evolution of well design concept for Vikulovskaya oil rim reservoir development with no possibility for fracking and first World's longest application of permanent monitoring solution for appraisal multilateral well with the access to the wellbore restricted by presence of ESP pump in West Siberia inside 7″ casing and 4.5″ production liner Horizontal Multilateral well.