收敛型生产结构中物料流动连续性改进的Pert方法

B. Zwolińska, E. Michlowicz, Małgorzata Werbińska
{"title":"收敛型生产结构中物料流动连续性改进的Pert方法","authors":"B. Zwolińska, E. Michlowicz, Małgorzata Werbińska","doi":"10.21008/J.2083-4950.2018.8.2.2","DOIUrl":null,"url":null,"abstract":"In the article there is a presentation of PERT method in calculation of production tasks beginning time. Main aim was to point out activities which determine production’s beginning in convergent production system.In analysis there was an usage of complex systems theory and there were several stages of decomposition into single production streams. In the work there is a presentation of a model which sets the moment of production processes beginning in a production structure which is characterized by high level of processes’ repetitions with different production parameters. Paper type: Research Paper Published online: 30 April 2018 Vol. 8, No. 2, pp. 143–153 DOI: 10.21008/j.2083-4950.2018.8.2.2 ISSN 2083-4942 (Print) ISSN 2083-4950 (Online) © 2018 Poznan University of Technology. All rights reserved.","PeriodicalId":324850,"journal":{"name":"Research in Logistics and Production","volume":"21 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Pert method in material’s flow continuity improvement in convergent production structure\",\"authors\":\"B. Zwolińska, E. Michlowicz, Małgorzata Werbińska\",\"doi\":\"10.21008/J.2083-4950.2018.8.2.2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the article there is a presentation of PERT method in calculation of production tasks beginning time. Main aim was to point out activities which determine production’s beginning in convergent production system.In analysis there was an usage of complex systems theory and there were several stages of decomposition into single production streams. In the work there is a presentation of a model which sets the moment of production processes beginning in a production structure which is characterized by high level of processes’ repetitions with different production parameters. Paper type: Research Paper Published online: 30 April 2018 Vol. 8, No. 2, pp. 143–153 DOI: 10.21008/j.2083-4950.2018.8.2.2 ISSN 2083-4942 (Print) ISSN 2083-4950 (Online) © 2018 Poznan University of Technology. All rights reserved.\",\"PeriodicalId\":324850,\"journal\":{\"name\":\"Research in Logistics and Production\",\"volume\":\"21 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Research in Logistics and Production\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21008/J.2083-4950.2018.8.2.2\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Research in Logistics and Production","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21008/J.2083-4950.2018.8.2.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了PERT方法在生产任务开始时间计算中的应用。主要目的是指出在趋同生产系统中决定生产起始的活动。在分析中使用了复杂系统理论,并将几个阶段分解为单个生产流。在作品中,有一个模型的呈现,该模型设置了生产过程的时刻,开始于生产结构,其特征是具有不同生产参数的高水平过程重复。论文类型:研究论文在线发表:2018年4月30日Vol. 8, No. 2, pp. 143-153 DOI: 10.21008/j.2083-4950.2018.8.2.2 ISSN 2083-4942 (Print) ISSN 2083-4950 (online)©2018波兹南理工大学。版权所有。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Pert method in material’s flow continuity improvement in convergent production structure
In the article there is a presentation of PERT method in calculation of production tasks beginning time. Main aim was to point out activities which determine production’s beginning in convergent production system.In analysis there was an usage of complex systems theory and there were several stages of decomposition into single production streams. In the work there is a presentation of a model which sets the moment of production processes beginning in a production structure which is characterized by high level of processes’ repetitions with different production parameters. Paper type: Research Paper Published online: 30 April 2018 Vol. 8, No. 2, pp. 143–153 DOI: 10.21008/j.2083-4950.2018.8.2.2 ISSN 2083-4942 (Print) ISSN 2083-4950 (Online) © 2018 Poznan University of Technology. All rights reserved.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信