{"title":"特高压变电站土建工程地基处理及抗震施工技术分析","authors":"Junruo Sun","doi":"10.26789/jzjg.2019.01.003","DOIUrl":null,"url":null,"abstract":"The paper analyzes and elaborates on the foundation treatment methods and seismic construction technology of UHV substation civil engineering, in order to provide a theoretical reference for the insiders.","PeriodicalId":305807,"journal":{"name":"城市建设理论研究—建筑结构","volume":"39 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Foundation Treatment and Seismic Construction Technology in UHV Substation Civil Engineering\",\"authors\":\"Junruo Sun\",\"doi\":\"10.26789/jzjg.2019.01.003\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper analyzes and elaborates on the foundation treatment methods and seismic construction technology of UHV substation civil engineering, in order to provide a theoretical reference for the insiders.\",\"PeriodicalId\":305807,\"journal\":{\"name\":\"城市建设理论研究—建筑结构\",\"volume\":\"39 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"城市建设理论研究—建筑结构\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26789/jzjg.2019.01.003\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"城市建设理论研究—建筑结构","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26789/jzjg.2019.01.003","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文对特高压变电站土建工程地基处理方法和抗震施工技术进行了分析和阐述,以期为业内人士提供理论参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Foundation Treatment and Seismic Construction Technology in UHV Substation Civil Engineering
The paper analyzes and elaborates on the foundation treatment methods and seismic construction technology of UHV substation civil engineering, in order to provide a theoretical reference for the insiders.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信