成本控制评估和实施计划的时间表研究涉及马加伦卡的住院治疗和项目项目

Arief Rijaluddin
{"title":"成本控制评估和实施计划的时间表研究涉及马加伦卡的住院治疗和项目项目","authors":"Arief Rijaluddin","doi":"10.31949/jensitec.v8i01.1910","DOIUrl":null,"url":null,"abstract":"Planning and controlling costs and time is part of the overall construction project management. In addition to the assessment in terms of quality, the achievement of a project can also be assessed in terms of cost and time. The costs that have been incurred and the time spent in completing a job must be measured continuously for deviations from the plan. The presence of significant cost and time deviations indicates poor project management. With the existence of project performance indicators in terms of cost and time this allows preventive actions so that project implementation goes according to plan. The concept of \"Earned Value\" is one of the tools used in project management that integrates cost and time and by using Ms. Projects. Ms. Project is a project management software product and is developed and sold by Microsoft. It is designed to assist a project manager in developing plans, assigning resources and tasks, tracking progress, managing budgets and analyzing workloads. From the results of the evaluation of cost control and project schedules on outpatient and basement building construction projects using the earned value method, it can be concluded that the CV (Cost Variant) in this project results in 0 which means the Zero Number on the Cost Variant indicates that the cost is within the budget, SV (Schedule). Variant ) the value shows a negative number, this means that the completion of the work is delayed, the CPI (Cost Performance Index) is 1, meaning that the expenditure is in accordance with the project budget","PeriodicalId":448230,"journal":{"name":"J-ENSITEC","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"STUDI EVALUASI PENGENDALIAN BIAYA (COST CONTROL) DAN JADWAL PELAKSANAAN (SCHEDULING) PADA PROYEK PEMBANGUNAN GEDUNG RAWAT JALAN DAN BASSEMENT RSUD MAJALENGKA MENGGUNAKAN METODE EARNED VALUE DAN SOFTWARE MS. PROJECT\",\"authors\":\"Arief Rijaluddin\",\"doi\":\"10.31949/jensitec.v8i01.1910\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Planning and controlling costs and time is part of the overall construction project management. In addition to the assessment in terms of quality, the achievement of a project can also be assessed in terms of cost and time. The costs that have been incurred and the time spent in completing a job must be measured continuously for deviations from the plan. The presence of significant cost and time deviations indicates poor project management. With the existence of project performance indicators in terms of cost and time this allows preventive actions so that project implementation goes according to plan. The concept of \\\"Earned Value\\\" is one of the tools used in project management that integrates cost and time and by using Ms. Projects. Ms. Project is a project management software product and is developed and sold by Microsoft. It is designed to assist a project manager in developing plans, assigning resources and tasks, tracking progress, managing budgets and analyzing workloads. From the results of the evaluation of cost control and project schedules on outpatient and basement building construction projects using the earned value method, it can be concluded that the CV (Cost Variant) in this project results in 0 which means the Zero Number on the Cost Variant indicates that the cost is within the budget, SV (Schedule). Variant ) the value shows a negative number, this means that the completion of the work is delayed, the CPI (Cost Performance Index) is 1, meaning that the expenditure is in accordance with the project budget\",\"PeriodicalId\":448230,\"journal\":{\"name\":\"J-ENSITEC\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-01-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"J-ENSITEC\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31949/jensitec.v8i01.1910\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"J-ENSITEC","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31949/jensitec.v8i01.1910","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

计划和控制成本和时间是整个建设项目管理的一部分。除了质量方面的评估,项目的成就也可以从成本和时间方面进行评估。完成一项工作所产生的成本和所花费的时间必须连续地测量与计划的偏差。存在显著的成本和时间偏差表明项目管理不善。有了成本和时间方面的项目绩效指标,就可以采取预防措施,使项目的实施按计划进行。“挣值”的概念是项目管理中使用的工具之一,它通过使用Ms. Projects集成了成本和时间。Ms. Project是一个项目管理软件产品,由微软开发和销售。它旨在帮助项目经理制定计划,分配资源和任务,跟踪进度,管理预算和分析工作量。利用挣值法对门诊和地下室建筑项目的成本控制和项目进度进行评价,可以得出该项目的CV (cost Variant)结果为0,即成本变量上的零数字表示成本在预算内,SV (Schedule)。变量)值显示为负数,这意味着工作的完成延迟,CPI(成本绩效指数)为1,意味着支出符合项目预算
本文章由计算机程序翻译,如有差异,请以英文原文为准。
STUDI EVALUASI PENGENDALIAN BIAYA (COST CONTROL) DAN JADWAL PELAKSANAAN (SCHEDULING) PADA PROYEK PEMBANGUNAN GEDUNG RAWAT JALAN DAN BASSEMENT RSUD MAJALENGKA MENGGUNAKAN METODE EARNED VALUE DAN SOFTWARE MS. PROJECT
Planning and controlling costs and time is part of the overall construction project management. In addition to the assessment in terms of quality, the achievement of a project can also be assessed in terms of cost and time. The costs that have been incurred and the time spent in completing a job must be measured continuously for deviations from the plan. The presence of significant cost and time deviations indicates poor project management. With the existence of project performance indicators in terms of cost and time this allows preventive actions so that project implementation goes according to plan. The concept of "Earned Value" is one of the tools used in project management that integrates cost and time and by using Ms. Projects. Ms. Project is a project management software product and is developed and sold by Microsoft. It is designed to assist a project manager in developing plans, assigning resources and tasks, tracking progress, managing budgets and analyzing workloads. From the results of the evaluation of cost control and project schedules on outpatient and basement building construction projects using the earned value method, it can be concluded that the CV (Cost Variant) in this project results in 0 which means the Zero Number on the Cost Variant indicates that the cost is within the budget, SV (Schedule). Variant ) the value shows a negative number, this means that the completion of the work is delayed, the CPI (Cost Performance Index) is 1, meaning that the expenditure is in accordance with the project budget
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信