{"title":"阻塞CL的ABS故障诊断图表","authors":"E. Spunei, I. Piroi, C. Muscai, Florina Piroi","doi":"10.1109/ICATE.2014.6972679","DOIUrl":null,"url":null,"abstract":"The Automatic Block Signal installations (ABS) is a system of powering and receiving circuits that ensure train traffic command, control, and signals between two consecutive train stations. The circuits are usually electronically or electrodynamically synchronized. Because the distance between two stations is at least 4 kilometers, any failure to these installations cause long traffic delays, especially since the maintenance staff must travel on foot to the site of the failure. To fix failures in the operation of BLA installations it is required that the maintenance staff is well acquainted with the system's wiring diagrams and their interrelations. The complexity of the wiring diagrams poses some problems in failure fixes. To ease the decision taking process in failure detection we present here diagnosis charts that lead to a quick and correct remedy decision. The diagnosis charts presented here are to be applied for cases when the current line (CL) is signaled as being occupied by rolling stock, but is in reality empty.","PeriodicalId":327050,"journal":{"name":"2014 International Conference on Applied and Theoretical Electricity (ICATE)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"ABS failure diagnosis charts for a blocked CL\",\"authors\":\"E. Spunei, I. Piroi, C. Muscai, Florina Piroi\",\"doi\":\"10.1109/ICATE.2014.6972679\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Automatic Block Signal installations (ABS) is a system of powering and receiving circuits that ensure train traffic command, control, and signals between two consecutive train stations. The circuits are usually electronically or electrodynamically synchronized. Because the distance between two stations is at least 4 kilometers, any failure to these installations cause long traffic delays, especially since the maintenance staff must travel on foot to the site of the failure. To fix failures in the operation of BLA installations it is required that the maintenance staff is well acquainted with the system's wiring diagrams and their interrelations. The complexity of the wiring diagrams poses some problems in failure fixes. To ease the decision taking process in failure detection we present here diagnosis charts that lead to a quick and correct remedy decision. The diagnosis charts presented here are to be applied for cases when the current line (CL) is signaled as being occupied by rolling stock, but is in reality empty.\",\"PeriodicalId\":327050,\"journal\":{\"name\":\"2014 International Conference on Applied and Theoretical Electricity (ICATE)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 International Conference on Applied and Theoretical Electricity (ICATE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICATE.2014.6972679\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 International Conference on Applied and Theoretical Electricity (ICATE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICATE.2014.6972679","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

自动阻塞信号装置(ABS)是一种供电和接收电路系统,用于确保两个连续火车站之间的列车交通指挥、控制和信号。这些电路通常是电子或电动态同步的。由于两个车站之间的距离至少为4公里,这些设施的任何故障都会造成长时间的交通延误,特别是因为维修人员必须步行前往故障地点。维修人员必须熟悉系统的接线图及其相互关系,才能解决BLA装置的操作故障。接线图的复杂性给故障修复带来了一些问题。为了简化故障检测中的决策过程,我们在这里提供诊断图表,以导致快速和正确的补救决策。这里给出的诊断图表适用于当前线路(CL)被机车车辆占用的信号,但实际上是空的情况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ABS failure diagnosis charts for a blocked CL
The Automatic Block Signal installations (ABS) is a system of powering and receiving circuits that ensure train traffic command, control, and signals between two consecutive train stations. The circuits are usually electronically or electrodynamically synchronized. Because the distance between two stations is at least 4 kilometers, any failure to these installations cause long traffic delays, especially since the maintenance staff must travel on foot to the site of the failure. To fix failures in the operation of BLA installations it is required that the maintenance staff is well acquainted with the system's wiring diagrams and their interrelations. The complexity of the wiring diagrams poses some problems in failure fixes. To ease the decision taking process in failure detection we present here diagnosis charts that lead to a quick and correct remedy decision. The diagnosis charts presented here are to be applied for cases when the current line (CL) is signaled as being occupied by rolling stock, but is in reality empty.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信