巴基斯坦印度河上游悬沙负荷的季节和空间特征及其控制因素

Muhammad Dodo Jagirani, Xiaonan Shi, Fan Zhang, S. Khalighi - Sigaroodi, C. Zeng, Xiong Xiao, Li Wang, Faizan-ur-Rehman Qaiser, Guanxing Wang
{"title":"巴基斯坦印度河上游悬沙负荷的季节和空间特征及其控制因素","authors":"Muhammad Dodo Jagirani, Xiaonan Shi, Fan Zhang, S. Khalighi - Sigaroodi, C. Zeng, Xiong Xiao, Li Wang, Faizan-ur-Rehman Qaiser, Guanxing Wang","doi":"10.21743/pjaec/2023.06.05","DOIUrl":null,"url":null,"abstract":"Understanding the seasonal and spatial characteristics of suspended sediment load is extremely important for efficient water resource management. The characteristics of suspended sediment load reflect the soil erosion, transport, and deposition. The upper Indus basin is a single source of fresh water and hydropower generation for the surroundings and downstream areas with a population of millions approximately. Simultaneously, the water resources in this area are badly affected by the sedimentation. Therefore, the focus of this study is to evaluate the seasonal variation and spatial distribution of suspended sediment load and figure out their controlling factors by using hydrometeorological data series collected from WAPDA and PMD. Annual sediment load at four mainstream stations accounted for 34.0 at Kachura, 86.7 at Bunji Bridge, 75.7 at Shatial and 57.7 (Mt) at Besham, respectively. The high sediment loads were observed during the summer season, accounting for 77.4% at Kachura, 85.6% at Bunji Bridge, 73.7% at Shatialand 76% at Beshamand 92.9% at Shyok, 69.1% at Hunza, 47.9% at Gilgit and 57.0% at Astore tributary respectively. Conclusively, contrasting suspended sediment load variability was observed throughout the study area. The high values of sediment loads were observed during the summer season, especially occurred during June, July and August. This indicates that serious soil erosion occurred during these three months in the area. It is therefore, strongly recommended to reduce soil loss and launch soil conservating activities, forestation and professional development work in the area, which could play an effective role to extend the lifeline of proposed water resource projects, especially the Diamer Bhasha (an under-construction dam in the region).","PeriodicalId":169509,"journal":{"name":"Pakistan Journal of Analytical and Environmental Chemistry","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Seasonal and spatial characteristics of suspended sediment load and their controlling factors in the Upper Indus River Basin, Pakistan\",\"authors\":\"Muhammad Dodo Jagirani, Xiaonan Shi, Fan Zhang, S. Khalighi - Sigaroodi, C. Zeng, Xiong Xiao, Li Wang, Faizan-ur-Rehman Qaiser, Guanxing Wang\",\"doi\":\"10.21743/pjaec/2023.06.05\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Understanding the seasonal and spatial characteristics of suspended sediment load is extremely important for efficient water resource management. The characteristics of suspended sediment load reflect the soil erosion, transport, and deposition. The upper Indus basin is a single source of fresh water and hydropower generation for the surroundings and downstream areas with a population of millions approximately. Simultaneously, the water resources in this area are badly affected by the sedimentation. Therefore, the focus of this study is to evaluate the seasonal variation and spatial distribution of suspended sediment load and figure out their controlling factors by using hydrometeorological data series collected from WAPDA and PMD. Annual sediment load at four mainstream stations accounted for 34.0 at Kachura, 86.7 at Bunji Bridge, 75.7 at Shatial and 57.7 (Mt) at Besham, respectively. The high sediment loads were observed during the summer season, accounting for 77.4% at Kachura, 85.6% at Bunji Bridge, 73.7% at Shatialand 76% at Beshamand 92.9% at Shyok, 69.1% at Hunza, 47.9% at Gilgit and 57.0% at Astore tributary respectively. Conclusively, contrasting suspended sediment load variability was observed throughout the study area. The high values of sediment loads were observed during the summer season, especially occurred during June, July and August. This indicates that serious soil erosion occurred during these three months in the area. It is therefore, strongly recommended to reduce soil loss and launch soil conservating activities, forestation and professional development work in the area, which could play an effective role to extend the lifeline of proposed water resource projects, especially the Diamer Bhasha (an under-construction dam in the region).\",\"PeriodicalId\":169509,\"journal\":{\"name\":\"Pakistan Journal of Analytical and Environmental Chemistry\",\"volume\":\"16 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-06-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Pakistan Journal of Analytical and Environmental Chemistry\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21743/pjaec/2023.06.05\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pakistan Journal of Analytical and Environmental Chemistry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21743/pjaec/2023.06.05","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

了解悬沙负荷的季节和空间特征对水资源的有效管理具有重要意义。悬沙荷载的特征反映了土壤的侵蚀、运移和沉积。印度河上游流域是周边地区和下游地区淡水和水力发电的单一来源,约有数百万人口。同时,该地区的水资源也受到泥沙淤积的严重影响。因此,本研究的重点是利用WAPDA和PMD收集的水文气象资料,评价悬沙负荷的季节变化和空间分布,并找出其控制因素。4个干流站年输沙量分别为Kachura 34.0、Bunji Bridge 86.7、Shatial 75.7和Besham 57.7 (Mt)。夏季泥沙负荷较高,Kachura占77.4%,Bunji桥占85.6%,Shatialand占73.7%,Beshamand占76%,Shyok占92.9%,Hunza占69.1%,Gilgit占47.9%,Astore支流占57.0%。最后,在整个研究区域观察到不同的悬沙负荷变化。夏季输沙量最大,特别是6、7、8月。这表明在这三个月里,该地区发生了严重的土壤侵蚀。因此,强烈建议减少水土流失,在该地区开展水土保持活动,植树造林和专业发展工作,这可以有效地延长拟建水资源项目的生命线,特别是该地区正在建设的迪亚默巴沙大坝。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Seasonal and spatial characteristics of suspended sediment load and their controlling factors in the Upper Indus River Basin, Pakistan
Understanding the seasonal and spatial characteristics of suspended sediment load is extremely important for efficient water resource management. The characteristics of suspended sediment load reflect the soil erosion, transport, and deposition. The upper Indus basin is a single source of fresh water and hydropower generation for the surroundings and downstream areas with a population of millions approximately. Simultaneously, the water resources in this area are badly affected by the sedimentation. Therefore, the focus of this study is to evaluate the seasonal variation and spatial distribution of suspended sediment load and figure out their controlling factors by using hydrometeorological data series collected from WAPDA and PMD. Annual sediment load at four mainstream stations accounted for 34.0 at Kachura, 86.7 at Bunji Bridge, 75.7 at Shatial and 57.7 (Mt) at Besham, respectively. The high sediment loads were observed during the summer season, accounting for 77.4% at Kachura, 85.6% at Bunji Bridge, 73.7% at Shatialand 76% at Beshamand 92.9% at Shyok, 69.1% at Hunza, 47.9% at Gilgit and 57.0% at Astore tributary respectively. Conclusively, contrasting suspended sediment load variability was observed throughout the study area. The high values of sediment loads were observed during the summer season, especially occurred during June, July and August. This indicates that serious soil erosion occurred during these three months in the area. It is therefore, strongly recommended to reduce soil loss and launch soil conservating activities, forestation and professional development work in the area, which could play an effective role to extend the lifeline of proposed water resource projects, especially the Diamer Bhasha (an under-construction dam in the region).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信