考虑下游生产线材料要求的热轧规划方法

Naiwei Tu, Xiaochuan Luo, Hui Huang, T. Chai, Bing-lin Zheng
{"title":"考虑下游生产线材料要求的热轧规划方法","authors":"Naiwei Tu, Xiaochuan Luo, Hui Huang, T. Chai, Bing-lin Zheng","doi":"10.1109/WCICA.2010.5554758","DOIUrl":null,"url":null,"abstract":"Hot rolling planning in steel and iron production process is analyzed and a prize-collecting vehicle routing problem model with uncertain rolling planning numbers for hot rolling planning is presented with balancing the workloads of downstream production lines as one objective. The model considers the jump limit of discharging temperature, finishing rolling temperature and coiling temperature of adjacent slabs, the rolling position of slab surface grade and mix rolling of multiple rolling type slabs, but also considers the reasonable arranging of warm-up materials and staple materials. A two-stage algorithm based on Variable Neighborhood Tabu Search is designed to solve the model. Computational experiments with industrial data show the effectiveness of the proposed model and algorithm.","PeriodicalId":315420,"journal":{"name":"2010 8th World Congress on Intelligent Control and Automation","volume":"66 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-07-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Method for hot rolling planning considering material requirements of downstream production lines\",\"authors\":\"Naiwei Tu, Xiaochuan Luo, Hui Huang, T. Chai, Bing-lin Zheng\",\"doi\":\"10.1109/WCICA.2010.5554758\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Hot rolling planning in steel and iron production process is analyzed and a prize-collecting vehicle routing problem model with uncertain rolling planning numbers for hot rolling planning is presented with balancing the workloads of downstream production lines as one objective. The model considers the jump limit of discharging temperature, finishing rolling temperature and coiling temperature of adjacent slabs, the rolling position of slab surface grade and mix rolling of multiple rolling type slabs, but also considers the reasonable arranging of warm-up materials and staple materials. A two-stage algorithm based on Variable Neighborhood Tabu Search is designed to solve the model. Computational experiments with industrial data show the effectiveness of the proposed model and algorithm.\",\"PeriodicalId\":315420,\"journal\":{\"name\":\"2010 8th World Congress on Intelligent Control and Automation\",\"volume\":\"66 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-07-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 8th World Congress on Intelligent Control and Automation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WCICA.2010.5554758\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 8th World Congress on Intelligent Control and Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WCICA.2010.5554758","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

分析了钢铁生产过程中的热轧规划问题,以平衡下游生产线的工作量为目标,建立了热轧规划数不确定的收奖车辆路线问题模型。该模型考虑了相邻板坯出料温度、精整轧制温度和卷取温度的跳限、板坯表面品位的轧制位置和多轧制型板坯的混轧,同时还考虑了预热料和短纤料的合理布置。设计了一种基于变邻域禁忌搜索的两阶段算法来求解该模型。工业数据的计算实验表明了该模型和算法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Method for hot rolling planning considering material requirements of downstream production lines
Hot rolling planning in steel and iron production process is analyzed and a prize-collecting vehicle routing problem model with uncertain rolling planning numbers for hot rolling planning is presented with balancing the workloads of downstream production lines as one objective. The model considers the jump limit of discharging temperature, finishing rolling temperature and coiling temperature of adjacent slabs, the rolling position of slab surface grade and mix rolling of multiple rolling type slabs, but also considers the reasonable arranging of warm-up materials and staple materials. A two-stage algorithm based on Variable Neighborhood Tabu Search is designed to solve the model. Computational experiments with industrial data show the effectiveness of the proposed model and algorithm.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信