{"title":"印度制造企业采用灵活性:当前视角","authors":"N. Nayak, P. Ray","doi":"10.1504/IJPSE.2011.041562","DOIUrl":null,"url":null,"abstract":"This study examines the current state of flexibility adoption in manufacturing firms in India, considering the important flexible equipments and indeed, this is the first such attempt. Adoption/implementation includes equipments such as work centre, process centre, support stations, network communications, integration and control. Questionnaire survey methodology is used for status evaluation: not implemented, implementation in progress, and fully implemented. It is found that adoption follows an incremental, piecemeal progression from the least complicated through intermediate to integrated technologies. A few important equipments currently adopted are: universal machining centre, local area network, automated inspection and testing station etc. In-house development, supplier’s development and flexibility outcomes play central role for flexibility adoption-related issues. The results empirically support and cast insights into the flexibility adoption trend. Based upon the findings, various important stra...","PeriodicalId":360947,"journal":{"name":"International Journal of Process Systems Engineering","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-07-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Flexibility adoption in Indian manufacturing firms: a current perspective\",\"authors\":\"N. Nayak, P. Ray\",\"doi\":\"10.1504/IJPSE.2011.041562\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study examines the current state of flexibility adoption in manufacturing firms in India, considering the important flexible equipments and indeed, this is the first such attempt. Adoption/implementation includes equipments such as work centre, process centre, support stations, network communications, integration and control. Questionnaire survey methodology is used for status evaluation: not implemented, implementation in progress, and fully implemented. It is found that adoption follows an incremental, piecemeal progression from the least complicated through intermediate to integrated technologies. A few important equipments currently adopted are: universal machining centre, local area network, automated inspection and testing station etc. In-house development, supplier’s development and flexibility outcomes play central role for flexibility adoption-related issues. The results empirically support and cast insights into the flexibility adoption trend. Based upon the findings, various important stra...\",\"PeriodicalId\":360947,\"journal\":{\"name\":\"International Journal of Process Systems Engineering\",\"volume\":\"40 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-07-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Process Systems Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJPSE.2011.041562\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Process Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJPSE.2011.041562","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Flexibility adoption in Indian manufacturing firms: a current perspective
This study examines the current state of flexibility adoption in manufacturing firms in India, considering the important flexible equipments and indeed, this is the first such attempt. Adoption/implementation includes equipments such as work centre, process centre, support stations, network communications, integration and control. Questionnaire survey methodology is used for status evaluation: not implemented, implementation in progress, and fully implemented. It is found that adoption follows an incremental, piecemeal progression from the least complicated through intermediate to integrated technologies. A few important equipments currently adopted are: universal machining centre, local area network, automated inspection and testing station etc. In-house development, supplier’s development and flexibility outcomes play central role for flexibility adoption-related issues. The results empirically support and cast insights into the flexibility adoption trend. Based upon the findings, various important stra...