{"title":"有源径向配电系统过流继电器复位的创新方法","authors":"M. Bahadornejad, Nicholas R. Merrington, N. Nair","doi":"10.1109/AUPEC.2018.8758056","DOIUrl":null,"url":null,"abstract":"Integration of Distributed Renewable Generation, into electricity distribution networks can be problematic for existing protection schemes due to the effects on fault current levels. In this paper an intrusive method is used to estimate on-line the Thevenin equivalent networks of upstream and downstream sections of a radial active distribution system. The estimated equivalent networks are then used to calculate the fault currents required for the over-current relays settings. The procedure is applicable to low voltage and medium voltage radial networks. OPAL-RT real time simulations are used to validate the proposed method. The requirements for implementing the developed algorithm are also introduced.","PeriodicalId":314530,"journal":{"name":"2018 Australasian Universities Power Engineering Conference (AUPEC)","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"An Innovative Method for Re-setting Over-current Relays in Active Radial Distribution System\",\"authors\":\"M. Bahadornejad, Nicholas R. Merrington, N. Nair\",\"doi\":\"10.1109/AUPEC.2018.8758056\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Integration of Distributed Renewable Generation, into electricity distribution networks can be problematic for existing protection schemes due to the effects on fault current levels. In this paper an intrusive method is used to estimate on-line the Thevenin equivalent networks of upstream and downstream sections of a radial active distribution system. The estimated equivalent networks are then used to calculate the fault currents required for the over-current relays settings. The procedure is applicable to low voltage and medium voltage radial networks. OPAL-RT real time simulations are used to validate the proposed method. The requirements for implementing the developed algorithm are also introduced.\",\"PeriodicalId\":314530,\"journal\":{\"name\":\"2018 Australasian Universities Power Engineering Conference (AUPEC)\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2018 Australasian Universities Power Engineering Conference (AUPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AUPEC.2018.8758056\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 Australasian Universities Power Engineering Conference (AUPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUPEC.2018.8758056","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An Innovative Method for Re-setting Over-current Relays in Active Radial Distribution System
Integration of Distributed Renewable Generation, into electricity distribution networks can be problematic for existing protection schemes due to the effects on fault current levels. In this paper an intrusive method is used to estimate on-line the Thevenin equivalent networks of upstream and downstream sections of a radial active distribution system. The estimated equivalent networks are then used to calculate the fault currents required for the over-current relays settings. The procedure is applicable to low voltage and medium voltage radial networks. OPAL-RT real time simulations are used to validate the proposed method. The requirements for implementing the developed algorithm are also introduced.