利用CSP和前向校验解决了电力系统的冗余分配问题

Abdelquoddouss Laghrissi, Mustapha ES-Sadqi, A. Idrissi
{"title":"利用CSP和前向校验解决了电力系统的冗余分配问题","authors":"Abdelquoddouss Laghrissi, Mustapha ES-Sadqi, A. Idrissi","doi":"10.1109/IRSEC.2016.7984036","DOIUrl":null,"url":null,"abstract":"Various players in the field of energy give a lot of importance to the evaluation of reliability of their electrical networks. Following our literature review, several limitations need to be pointed out. In this paper, we will present an accurate method of decision making based on constraint programming. Our main contributions are i) to propose a new generalized constraint based formalization of the problem that integrates the universal generating function ii) to adapt and extend the well known forward checking algorithm to find the optimal topology that combines various components by maximizing the reliability and reducing the investment cost. Our approach takes into account all system parameters unlike most existing methods of the literature. The obtained experimental results showed the efficiency of the proposed approach.","PeriodicalId":180557,"journal":{"name":"2016 International Renewable and Sustainable Energy Conference (IRSEC)","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Solving redundancy allocation problem applied to electrical systems using CSP and forward checking\",\"authors\":\"Abdelquoddouss Laghrissi, Mustapha ES-Sadqi, A. Idrissi\",\"doi\":\"10.1109/IRSEC.2016.7984036\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Various players in the field of energy give a lot of importance to the evaluation of reliability of their electrical networks. Following our literature review, several limitations need to be pointed out. In this paper, we will present an accurate method of decision making based on constraint programming. Our main contributions are i) to propose a new generalized constraint based formalization of the problem that integrates the universal generating function ii) to adapt and extend the well known forward checking algorithm to find the optimal topology that combines various components by maximizing the reliability and reducing the investment cost. Our approach takes into account all system parameters unlike most existing methods of the literature. The obtained experimental results showed the efficiency of the proposed approach.\",\"PeriodicalId\":180557,\"journal\":{\"name\":\"2016 International Renewable and Sustainable Energy Conference (IRSEC)\",\"volume\":\"98 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 International Renewable and Sustainable Energy Conference (IRSEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IRSEC.2016.7984036\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Renewable and Sustainable Energy Conference (IRSEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IRSEC.2016.7984036","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

能源领域的各个参与者都非常重视电网的可靠性评估。根据我们的文献综述,需要指出几个局限性。本文将提出一种基于约束规划的精确决策方法。我们的主要贡献是i)提出了一种新的基于广义约束的问题形式化,该问题集成了通用生成函数ii)适应和扩展了众所周知的前向检查算法,以通过最大化可靠性和降低投资成本来找到组合各种组件的最优拓扑。与文献中大多数现有方法不同,我们的方法考虑了所有系统参数。实验结果表明了该方法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Solving redundancy allocation problem applied to electrical systems using CSP and forward checking
Various players in the field of energy give a lot of importance to the evaluation of reliability of their electrical networks. Following our literature review, several limitations need to be pointed out. In this paper, we will present an accurate method of decision making based on constraint programming. Our main contributions are i) to propose a new generalized constraint based formalization of the problem that integrates the universal generating function ii) to adapt and extend the well known forward checking algorithm to find the optimal topology that combines various components by maximizing the reliability and reducing the investment cost. Our approach takes into account all system parameters unlike most existing methods of the literature. The obtained experimental results showed the efficiency of the proposed approach.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信