{"title":"缆索电厂飞轮储能","authors":"G. Becherini, S. Di Fraia, B. Tellini","doi":"10.1109/ICCEP.2011.6036312","DOIUrl":null,"url":null,"abstract":"Energetic issues represent severe tasks at present. In particular intermittent loads capable to reverse the load flow are intensively studied in the last times, with the aim to recover energy as much as possible. Examples are trains and subways during braking phases, and also funiculars during descents. The present work focuses in general on funicular electric plants, which are notable examples of intermittent loads integrated (sometimes) with renewable (photo-voltaic) energy sources. The main idea is to investigate the possibility to insert a hybrid flywheel and electrochemical based storage system able to maximize system performances. An accurate model of the whole plant has been implemented in Simulink™ and several simulations have been carried out. Finally main results are shown ad discussed.","PeriodicalId":403158,"journal":{"name":"2011 International Conference on Clean Electrical Power (ICCEP)","volume":"57 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Flywheel energy storage in funicular electric plant\",\"authors\":\"G. Becherini, S. Di Fraia, B. Tellini\",\"doi\":\"10.1109/ICCEP.2011.6036312\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Energetic issues represent severe tasks at present. In particular intermittent loads capable to reverse the load flow are intensively studied in the last times, with the aim to recover energy as much as possible. Examples are trains and subways during braking phases, and also funiculars during descents. The present work focuses in general on funicular electric plants, which are notable examples of intermittent loads integrated (sometimes) with renewable (photo-voltaic) energy sources. The main idea is to investigate the possibility to insert a hybrid flywheel and electrochemical based storage system able to maximize system performances. An accurate model of the whole plant has been implemented in Simulink™ and several simulations have been carried out. Finally main results are shown ad discussed.\",\"PeriodicalId\":403158,\"journal\":{\"name\":\"2011 International Conference on Clean Electrical Power (ICCEP)\",\"volume\":\"57 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Conference on Clean Electrical Power (ICCEP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCEP.2011.6036312\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Clean Electrical Power (ICCEP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCEP.2011.6036312","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

精力充沛的问题代表着当前严峻的任务。特别是能够逆转负载流的间歇性负载在最后的时间被深入研究,目的是尽可能多地恢复能量。例如,火车和地铁在刹车阶段,以及缆车在下降阶段。目前的工作主要集中在索道发电厂,这是间歇性负荷(有时)与可再生(光伏)能源相结合的显著例子。主要想法是研究插入混合飞轮和电化学存储系统的可能性,从而最大化系统性能。在Simulink™中实现了整个工厂的精确模型,并进行了多次仿真。最后给出了主要结果并进行了讨论。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Flywheel energy storage in funicular electric plant
Energetic issues represent severe tasks at present. In particular intermittent loads capable to reverse the load flow are intensively studied in the last times, with the aim to recover energy as much as possible. Examples are trains and subways during braking phases, and also funiculars during descents. The present work focuses in general on funicular electric plants, which are notable examples of intermittent loads integrated (sometimes) with renewable (photo-voltaic) energy sources. The main idea is to investigate the possibility to insert a hybrid flywheel and electrochemical based storage system able to maximize system performances. An accurate model of the whole plant has been implemented in Simulink™ and several simulations have been carried out. Finally main results are shown ad discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信