在Boßler隧道掘进机掘进低强度粘土岩的经验

Jürgen Voringer, Reinhard Zenz, Anna-Maria Meyer, A. Strauss, A. Hofmann
{"title":"在Boßler隧道掘进机掘进低强度粘土岩的经验","authors":"Jürgen Voringer, Reinhard Zenz, Anna-Maria Meyer, A. Strauss, A. Hofmann","doi":"10.1002/geot.201600084","DOIUrl":null,"url":null,"abstract":"The Tunnel Albaufstieg consortium won the contract with an alternative proposal to drive a section about 2.8 km long of the 8.8 km long Boßler Tunnel with a tunnel boring machine (TBM). The next section, where squeezing conditions were forecast, was to be tunnelled by the shotcrete method according to the tender documents. Manifold and extensive additional investigations delivered the basis for the extension of the TBM drive along the entire length of the Boßler Tunnels. The driving of the section through the Aalenian 1 geology was problem free due to the low strengths and good cuttability of the rock mass combined with its impermeability. The next section in the intercalation of claystone and sandstone of the Aalenian 2 was much more differentiated but managable. The breakthrough of the east bore of the Boßler Tunnel confirms to the responsible people for the client and contractor that the decision to follow the aim of consistent mechanised tunnelling had been correct.","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"23 3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Experience with the TBM drive through clay rocks with low strength in the Boßler Tunnel\",\"authors\":\"Jürgen Voringer, Reinhard Zenz, Anna-Maria Meyer, A. Strauss, A. Hofmann\",\"doi\":\"10.1002/geot.201600084\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Tunnel Albaufstieg consortium won the contract with an alternative proposal to drive a section about 2.8 km long of the 8.8 km long Boßler Tunnel with a tunnel boring machine (TBM). The next section, where squeezing conditions were forecast, was to be tunnelled by the shotcrete method according to the tender documents. Manifold and extensive additional investigations delivered the basis for the extension of the TBM drive along the entire length of the Boßler Tunnels. The driving of the section through the Aalenian 1 geology was problem free due to the low strengths and good cuttability of the rock mass combined with its impermeability. The next section in the intercalation of claystone and sandstone of the Aalenian 2 was much more differentiated but managable. The breakthrough of the east bore of the Boßler Tunnel confirms to the responsible people for the client and contractor that the decision to follow the aim of consistent mechanised tunnelling had been correct.\",\"PeriodicalId\":170042,\"journal\":{\"name\":\"Geomechanics and Tunnelling\",\"volume\":\"23 3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geomechanics and Tunnelling\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/geot.201600084\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.201600084","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

Tunnel Albaufstieg财团以另一种方案赢得了合同,即使用隧道掘进机(TBM)开挖8.8公里长的Boßler隧道中约2.8公里长的一段。根据招标文件,下一段将采用喷射混凝土法掘进,预计挤压条件将会出现。多种多样和广泛的额外调查为沿着Boßler隧道的整个长度扩展TBM驱动器提供了基础。由于岩体强度低,可切削性好,再加上岩体的抗渗性,使得该段的掘进没有问题。下一段阿勒二系粘土岩和砂岩的夹层分化程度要高得多,但仍可控制。Boßler隧道东孔的突破向客户和承包商的负责人证实,遵循一致的机械化隧道掘进目标的决定是正确的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Experience with the TBM drive through clay rocks with low strength in the Boßler Tunnel
The Tunnel Albaufstieg consortium won the contract with an alternative proposal to drive a section about 2.8 km long of the 8.8 km long Boßler Tunnel with a tunnel boring machine (TBM). The next section, where squeezing conditions were forecast, was to be tunnelled by the shotcrete method according to the tender documents. Manifold and extensive additional investigations delivered the basis for the extension of the TBM drive along the entire length of the Boßler Tunnels. The driving of the section through the Aalenian 1 geology was problem free due to the low strengths and good cuttability of the rock mass combined with its impermeability. The next section in the intercalation of claystone and sandstone of the Aalenian 2 was much more differentiated but managable. The breakthrough of the east bore of the Boßler Tunnel confirms to the responsible people for the client and contractor that the decision to follow the aim of consistent mechanised tunnelling had been correct.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信