{"title":"通电电力变压器的除泥","authors":"R. Parrish, J. J. Kelly","doi":"10.1109/EIC.1977.7461935","DOIUrl":null,"url":null,"abstract":"A method has been developed whereby the life of power transformers (those 500 KVA and greater) can be extended through a unique process of removing sludge from energized transformers. This paper zeroes in on the fundamental problem of power transformers-oil deterioration and its destructive effect on the cellulose insulating system. The discussion considers seven (7) alternatives to service transformers concluding with the unique DeSludging treatment. The key to Preventative Maintenance lies in annual oil testing. Its primary purposes are to pinpoint the condition of a transformer's insulating system and to determine the work necessary to correct the situation. Twelve years experience has shown that even the worst cases have responded to this unique desludging process. In most instances these transformers have been completely desludged after one treatment. Equally bad transformers have required one additional treatment, and in rare cases, a third treatment was necessary to finish the desludging procedure. Annual transformer oil tests have verified these findings.","PeriodicalId":214025,"journal":{"name":"1977 EIC 13th Electrical/Electronics Insulation Conference","volume":"23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1977-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Desludging of energized power transformers\",\"authors\":\"R. Parrish, J. J. Kelly\",\"doi\":\"10.1109/EIC.1977.7461935\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A method has been developed whereby the life of power transformers (those 500 KVA and greater) can be extended through a unique process of removing sludge from energized transformers. This paper zeroes in on the fundamental problem of power transformers-oil deterioration and its destructive effect on the cellulose insulating system. The discussion considers seven (7) alternatives to service transformers concluding with the unique DeSludging treatment. The key to Preventative Maintenance lies in annual oil testing. Its primary purposes are to pinpoint the condition of a transformer's insulating system and to determine the work necessary to correct the situation. Twelve years experience has shown that even the worst cases have responded to this unique desludging process. In most instances these transformers have been completely desludged after one treatment. Equally bad transformers have required one additional treatment, and in rare cases, a third treatment was necessary to finish the desludging procedure. Annual transformer oil tests have verified these findings.\",\"PeriodicalId\":214025,\"journal\":{\"name\":\"1977 EIC 13th Electrical/Electronics Insulation Conference\",\"volume\":\"23 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1977-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1977 EIC 13th Electrical/Electronics Insulation Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EIC.1977.7461935\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1977 EIC 13th Electrical/Electronics Insulation Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EIC.1977.7461935","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

已经开发出一种方法,通过从通电变压器中去除污泥的独特工艺,可以延长电力变压器(500kva及以上)的寿命。本文针对电力变压器的基本问题——油变质及其对纤维素绝缘系统的破坏作用进行了研究。讨论考虑了七(7)种变压器的替代方案,并以独特的除泥处理结束。预防性维修的关键在于每年对机油进行检测。其主要目的是查明变压器绝缘系统的状况,并确定纠正这种情况所需的工作。12年的经验表明,即使是最严重的病例也对这种独特的除泥过程有反应。在大多数情况下,经过一次处理后,这些变压器已完全去除污泥。同样糟糕的变压器需要一次额外的处理,在极少数情况下,第三次处理是必要的,以完成除泥程序。年度变压器油试验证实了这些发现。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Desludging of energized power transformers
A method has been developed whereby the life of power transformers (those 500 KVA and greater) can be extended through a unique process of removing sludge from energized transformers. This paper zeroes in on the fundamental problem of power transformers-oil deterioration and its destructive effect on the cellulose insulating system. The discussion considers seven (7) alternatives to service transformers concluding with the unique DeSludging treatment. The key to Preventative Maintenance lies in annual oil testing. Its primary purposes are to pinpoint the condition of a transformer's insulating system and to determine the work necessary to correct the situation. Twelve years experience has shown that even the worst cases have responded to this unique desludging process. In most instances these transformers have been completely desludged after one treatment. Equally bad transformers have required one additional treatment, and in rare cases, a third treatment was necessary to finish the desludging procedure. Annual transformer oil tests have verified these findings.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信