{"title":"四相交流架空连接的经济可行性","authors":"D. Lauria, G. Mazzanti, S. Quaia","doi":"10.1109/ICCEP.2011.6036287","DOIUrl":null,"url":null,"abstract":"The goal of this paper is assessing the economic feasibility of four-phase AC overhead connections, i.e. the real chance that such lines have of being competitive with commonly-used solutions for power transmission. For this reason, the paper illustrates an economical comparison among innovative 325 kV four-phase ac lines, traditional 400 kV three-phase ac lines and increasingly-popular 500 kV HVDC lines. These systems are considered firstly in single-circuit and secondly in double-circuit overhead arrangement. The comparison is based on the main cost items that characterize these lines, namely investment costs, energy losses costs and reliability-related costs. The uncertainty of the relevant parameters, particularly significant as far as innovative four-phase ac lines are concerned, is also discussed.","PeriodicalId":403158,"journal":{"name":"2011 International Conference on Clean Electrical Power (ICCEP)","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"The economic feasibility of four-phase AC overhead connections\",\"authors\":\"D. Lauria, G. Mazzanti, S. Quaia\",\"doi\":\"10.1109/ICCEP.2011.6036287\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The goal of this paper is assessing the economic feasibility of four-phase AC overhead connections, i.e. the real chance that such lines have of being competitive with commonly-used solutions for power transmission. For this reason, the paper illustrates an economical comparison among innovative 325 kV four-phase ac lines, traditional 400 kV three-phase ac lines and increasingly-popular 500 kV HVDC lines. These systems are considered firstly in single-circuit and secondly in double-circuit overhead arrangement. The comparison is based on the main cost items that characterize these lines, namely investment costs, energy losses costs and reliability-related costs. The uncertainty of the relevant parameters, particularly significant as far as innovative four-phase ac lines are concerned, is also discussed.\",\"PeriodicalId\":403158,\"journal\":{\"name\":\"2011 International Conference on Clean Electrical Power (ICCEP)\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-06-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Conference on Clean Electrical Power (ICCEP)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICCEP.2011.6036287\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Clean Electrical Power (ICCEP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCEP.2011.6036287","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本文的目标是评估四相交流架空连接的经济可行性,即这种线路与常用的电力传输解决方案竞争的真正机会。为此,本文对新型325千伏四相交流线路、传统400千伏三相交流线路和日益普及的500千伏高压直流线路进行了经济性比较。这些系统首先考虑单线架空布置,其次考虑双线架空布置。比较是基于这些线路的主要成本项目,即投资成本、能源损失成本和与可靠性有关的成本。文中还讨论了有关参数的不确定性,特别是对新型四相交流线路的不确定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The economic feasibility of four-phase AC overhead connections
The goal of this paper is assessing the economic feasibility of four-phase AC overhead connections, i.e. the real chance that such lines have of being competitive with commonly-used solutions for power transmission. For this reason, the paper illustrates an economical comparison among innovative 325 kV four-phase ac lines, traditional 400 kV three-phase ac lines and increasingly-popular 500 kV HVDC lines. These systems are considered firstly in single-circuit and secondly in double-circuit overhead arrangement. The comparison is based on the main cost items that characterize these lines, namely investment costs, energy losses costs and reliability-related costs. The uncertainty of the relevant parameters, particularly significant as far as innovative four-phase ac lines are concerned, is also discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信