{"title":"新的高功率连续速调管","authors":"A. Beunas, E. Boghossian, R. Marchesin","doi":"10.1109/IVEC.2003.1286097","DOIUrl":null,"url":null,"abstract":"Thales Electron Devices (TED) has been awarded a contract by CERN to develop and produce 20 units of the klystrons needed to feed the Large Hadrons Collider (LHC). Each of these delivers 300 kW of CW RF power at 400 MHz. Three klystrons have been delivered to CERN up to now.","PeriodicalId":203178,"journal":{"name":"4th IEEE International Conference on Vacuum Electronics, 2003","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"New high power CW klystrons at TED\",\"authors\":\"A. Beunas, E. Boghossian, R. Marchesin\",\"doi\":\"10.1109/IVEC.2003.1286097\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Thales Electron Devices (TED) has been awarded a contract by CERN to develop and produce 20 units of the klystrons needed to feed the Large Hadrons Collider (LHC). Each of these delivers 300 kW of CW RF power at 400 MHz. Three klystrons have been delivered to CERN up to now.\",\"PeriodicalId\":203178,\"journal\":{\"name\":\"4th IEEE International Conference on Vacuum Electronics, 2003\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-05-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"4th IEEE International Conference on Vacuum Electronics, 2003\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IVEC.2003.1286097\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"4th IEEE International Conference on Vacuum Electronics, 2003","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IVEC.2003.1286097","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Thales Electron Devices (TED) has been awarded a contract by CERN to develop and produce 20 units of the klystrons needed to feed the Large Hadrons Collider (LHC). Each of these delivers 300 kW of CW RF power at 400 MHz. Three klystrons have been delivered to CERN up to now.