采用半引导蒙特卡罗方法快速模拟发电机组的强制停机

A. Scully, A. Harpur, K. Le, J. Day, M. Malone, T. Mousseau
{"title":"采用半引导蒙特卡罗方法快速模拟发电机组的强制停机","authors":"A. Scully, A. Harpur, K. Le, J. Day, M. Malone, T. Mousseau","doi":"10.1109/PICA.1991.160660","DOIUrl":null,"url":null,"abstract":"A semiguided Monte Carlo technique to schedule forced outage periods of generating units is described. The key advantage of this method lies in its ability to create forced-outage schedules that are statistically balanced. When tested against the pure Monte Carlo method, the semiguided Monte Carlo technique provided much faster convergence and greatly reduced the number of Monte Carlo iterations required to produce reliable production cost results. The Electricity Supply Board implemented this technique in its chronological dispatch program. The program can be used for a diverse spectrum of applications, from evaluating different generation expansion plans and estimating fuel requirements to evaluating the cost/benefit of improving various plant parameters, such as forced outage rates.<<ETX>>","PeriodicalId":287152,"journal":{"name":"[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference","volume":"18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-05-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units\",\"authors\":\"A. Scully, A. Harpur, K. Le, J. Day, M. Malone, T. Mousseau\",\"doi\":\"10.1109/PICA.1991.160660\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A semiguided Monte Carlo technique to schedule forced outage periods of generating units is described. The key advantage of this method lies in its ability to create forced-outage schedules that are statistically balanced. When tested against the pure Monte Carlo method, the semiguided Monte Carlo technique provided much faster convergence and greatly reduced the number of Monte Carlo iterations required to produce reliable production cost results. The Electricity Supply Board implemented this technique in its chronological dispatch program. The program can be used for a diverse spectrum of applications, from evaluating different generation expansion plans and estimating fuel requirements to evaluating the cost/benefit of improving various plant parameters, such as forced outage rates.<<ETX>>\",\"PeriodicalId\":287152,\"journal\":{\"name\":\"[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference\",\"volume\":\"18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-05-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICA.1991.160660\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[Proceedings] Conference Papers 1991 Power Industry Computer Application Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICA.1991.160660","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

介绍了一种半引导蒙特卡罗技术来规划发电机组的强制停运期。这种方法的主要优点在于它能够创建统计平衡的强制停机计划。当与纯蒙特卡罗方法进行测试时,半引导蒙特卡罗技术提供了更快的收敛速度,并大大减少了生成可靠的生产成本结果所需的蒙特卡罗迭代次数。电力供应委员会在其时序调度程序中实施了这种技术。该程序可用于各种应用,从评估不同的发电扩展计划和估计燃料需求到评估改善各种工厂参数的成本/效益,例如强制停运率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Using a semi-guided Monte Carlo method for faster simulation of forced outages of generating units
A semiguided Monte Carlo technique to schedule forced outage periods of generating units is described. The key advantage of this method lies in its ability to create forced-outage schedules that are statistically balanced. When tested against the pure Monte Carlo method, the semiguided Monte Carlo technique provided much faster convergence and greatly reduced the number of Monte Carlo iterations required to produce reliable production cost results. The Electricity Supply Board implemented this technique in its chronological dispatch program. The program can be used for a diverse spectrum of applications, from evaluating different generation expansion plans and estimating fuel requirements to evaluating the cost/benefit of improving various plant parameters, such as forced outage rates.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信