建模学习阶段对结对编程项目的业务价值的影响

F. Padberg, Matthias M. Müller
{"title":"建模学习阶段对结对编程项目的业务价值的影响","authors":"F. Padberg, Matthias M. Müller","doi":"10.1109/APSEC.2004.67","DOIUrl":null,"url":null,"abstract":"Pair programmers need a \"warmup phase\" before the pair can work at full speed. The length of the learning interval varies, depending on how experienced the developers are with pair programming and how familiar they are with each other. We study how large the impact of the lower pair productivity during warmup is on the business value of the pair programming project. To this end, we extend our net present value model for pair programming to explicitly include a learning interval for pairs. We then carry out a simulation study where we vary the shape of the learning curve, the length of the learning interval, the final productivity level of the pairs, the market pressure, and the size of the workforce. Our simulations show that the cost of the warmup phase is reasonably small compared to the project value, but nonetheless must be taken into account when estimating the project. Our results also suggest that the learning overhead is not an obstacle to introducing and using pair programming in a real environment.","PeriodicalId":213849,"journal":{"name":"11th Asia-Pacific Software Engineering Conference","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Modeling the impact of a learning phase on the business value of a pair programming project\",\"authors\":\"F. Padberg, Matthias M. Müller\",\"doi\":\"10.1109/APSEC.2004.67\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Pair programmers need a \\\"warmup phase\\\" before the pair can work at full speed. The length of the learning interval varies, depending on how experienced the developers are with pair programming and how familiar they are with each other. We study how large the impact of the lower pair productivity during warmup is on the business value of the pair programming project. To this end, we extend our net present value model for pair programming to explicitly include a learning interval for pairs. We then carry out a simulation study where we vary the shape of the learning curve, the length of the learning interval, the final productivity level of the pairs, the market pressure, and the size of the workforce. Our simulations show that the cost of the warmup phase is reasonably small compared to the project value, but nonetheless must be taken into account when estimating the project. Our results also suggest that the learning overhead is not an obstacle to introducing and using pair programming in a real environment.\",\"PeriodicalId\":213849,\"journal\":{\"name\":\"11th Asia-Pacific Software Engineering Conference\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-11-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th Asia-Pacific Software Engineering Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/APSEC.2004.67\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th Asia-Pacific Software Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APSEC.2004.67","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

结对程序员在结对全速工作之前需要一个“热身阶段”。学习间隔的长短取决于开发人员对结对编程的经验以及他们彼此之间的熟悉程度。我们研究了预热期间较低的结对生产力对结对编程项目的业务价值的影响有多大。为此,我们扩展了结对编程的净现值模型,以显式地包括结对的学习间隔。然后,我们进行了模拟研究,其中我们改变了学习曲线的形状、学习间隔的长度、对的最终生产力水平、市场压力和劳动力规模。我们的模拟显示,与项目价值相比,预热阶段的成本相当小,但在评估项目时必须考虑到这一点。我们的结果还表明,学习开销并不是在真实环境中引入和使用结对编程的障碍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Modeling the impact of a learning phase on the business value of a pair programming project
Pair programmers need a "warmup phase" before the pair can work at full speed. The length of the learning interval varies, depending on how experienced the developers are with pair programming and how familiar they are with each other. We study how large the impact of the lower pair productivity during warmup is on the business value of the pair programming project. To this end, we extend our net present value model for pair programming to explicitly include a learning interval for pairs. We then carry out a simulation study where we vary the shape of the learning curve, the length of the learning interval, the final productivity level of the pairs, the market pressure, and the size of the workforce. Our simulations show that the cost of the warmup phase is reasonably small compared to the project value, but nonetheless must be taken into account when estimating the project. Our results also suggest that the learning overhead is not an obstacle to introducing and using pair programming in a real environment.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信