{"title":"基于可靠性中心维护(RCM)和基于风险的维护(RBM)的案例研究","authors":"Fachri Husaini, J. Alhilman, Nurdinintya Athari","doi":"10.25124/ijies.v2i02.20","DOIUrl":null,"url":null,"abstract":"PT Pudak Scientific is a company engaged in the manufacture of aircraft parts industry. Meeting the precise and timely demand of aerospace parts from customers becomes a major corporate responsibility. However, Loss Revenue often occurs due to engine breakdown. So that cause because the production target is not achieved, the product reject, and the delay of delivery. One of the machines that often experience breakdown is Mori seiki NH4000 DCG. Mori seiki NH4000 DCG is the finishing machine for Blank fork End product. The demand for this part is quite large, making it a tough task for the Mori Seiki NH4000 DCG machine. But because the breakdown of the machine is high enough to cause production targets every month are often not met. In addition, Maintenance activities that have not noticed the characteristics of engine damage, as well as the distribution of historical data of the machine causing less effective and efficient actions resulted in substantial Maintenance costs. Based on the results of risk analysis of Mori Seiki NH4000 DCG engine damage, in terms of performance loss system caused by a large enough that is 3.773% of machine production capacity per year. This figure exceeds the risk acceptance criteria by the company that is 2%. Therefore it is necessary to find the appropriate Maintenance policy for the Mori Seiki NH4000 DCG machine. The approach is to use Reliability Centeres Maintenance and Risk Based Maintenance. Based on the above two approaches obtained the appropriate interval time so that the Maintenance activities more effective and can improve the efficiency of treatment by reducing the cost of care previously Rp167.506.286, - per year, to Rp 96.147.061, - per year. With the policy is expected to reduce engine breakdown and performance loss caused. So the number of risks that arise for the future are within the criteria of acceptance set by the company. \n  \nKeywords: Preventive Maintenance, Reliability centered Maintenance, risk based Maintenance, Performance loss","PeriodicalId":217640,"journal":{"name":"International Journal of Innovation in Enterprise System","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Proposed Policy Preventive Maintenance Machine Moriseiki NH 4000 DCG Method of Reliability Center Maintenance (RCM) And Risk Based Maintenance (RBM) Case Study PT Pudak Scientific\",\"authors\":\"Fachri Husaini, J. Alhilman, Nurdinintya Athari\",\"doi\":\"10.25124/ijies.v2i02.20\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"PT Pudak Scientific is a company engaged in the manufacture of aircraft parts industry. Meeting the precise and timely demand of aerospace parts from customers becomes a major corporate responsibility. However, Loss Revenue often occurs due to engine breakdown. So that cause because the production target is not achieved, the product reject, and the delay of delivery. One of the machines that often experience breakdown is Mori seiki NH4000 DCG. Mori seiki NH4000 DCG is the finishing machine for Blank fork End product. The demand for this part is quite large, making it a tough task for the Mori Seiki NH4000 DCG machine. But because the breakdown of the machine is high enough to cause production targets every month are often not met. In addition, Maintenance activities that have not noticed the characteristics of engine damage, as well as the distribution of historical data of the machine causing less effective and efficient actions resulted in substantial Maintenance costs. Based on the results of risk analysis of Mori Seiki NH4000 DCG engine damage, in terms of performance loss system caused by a large enough that is 3.773% of machine production capacity per year. This figure exceeds the risk acceptance criteria by the company that is 2%. Therefore it is necessary to find the appropriate Maintenance policy for the Mori Seiki NH4000 DCG machine. The approach is to use Reliability Centeres Maintenance and Risk Based Maintenance. Based on the above two approaches obtained the appropriate interval time so that the Maintenance activities more effective and can improve the efficiency of treatment by reducing the cost of care previously Rp167.506.286, - per year, to Rp 96.147.061, - per year. With the policy is expected to reduce engine breakdown and performance loss caused. So the number of risks that arise for the future are within the criteria of acceptance set by the company. \\n  \\nKeywords: Preventive Maintenance, Reliability centered Maintenance, risk based Maintenance, Performance loss\",\"PeriodicalId\":217640,\"journal\":{\"name\":\"International Journal of Innovation in Enterprise System\",\"volume\":\"14 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-07-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Innovation in Enterprise System\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25124/ijies.v2i02.20\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Innovation in Enterprise System","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25124/ijies.v2i02.20","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

PT Pudak Scientific是一家从事飞机零部件制造行业的公司。满足客户对航空航天零部件精确、及时的需求成为企业的一项重大责任。然而,由于发动机故障,经常发生收入损失。以致造成由于生产目标没有达到,产品被拒收,而延迟交货。Mori seiki NH4000 DCG是经常发生故障的机器之一。森精机NH4000 DCG是毛坯刀叉成品精加工机。这个零件的需求量很大,对于森精机NH4000 DCG机来说是一个艰巨的任务。但由于机器的故障率高到足以造成每个月的生产目标经常达不到。此外,维修活动没有注意到发动机损坏的特征,以及机器历史数据的分布,导致行动的有效性和效率降低,导致了大量的维修成本。根据对森精机NH4000 DCG发动机损坏的风险分析结果,在性能损失系统方面造成的损失足够大,即每年占整机生产能力的3.773%。这个数字超过了公司的风险接受标准,即2%。因此,有必要为森精机NH4000 DCG机找到合适的维护政策。方法是使用可靠性中心维护和基于风险的维护。基于上述两种方法,获得了适当的间隔时间,使维持活动更有效,并可以通过减少每年的护理费用(从每年167.506.286卢比)来提高治疗效率,至每年96.147.061卢比。该政策有望减少发动机故障和性能损失所造成的。因此,未来出现的风险数量在公司设定的可接受标准范围内。关键词:预防性维护,以可靠性为中心的维护,基于风险的维护,性能损失
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Proposed Policy Preventive Maintenance Machine Moriseiki NH 4000 DCG Method of Reliability Center Maintenance (RCM) And Risk Based Maintenance (RBM) Case Study PT Pudak Scientific
PT Pudak Scientific is a company engaged in the manufacture of aircraft parts industry. Meeting the precise and timely demand of aerospace parts from customers becomes a major corporate responsibility. However, Loss Revenue often occurs due to engine breakdown. So that cause because the production target is not achieved, the product reject, and the delay of delivery. One of the machines that often experience breakdown is Mori seiki NH4000 DCG. Mori seiki NH4000 DCG is the finishing machine for Blank fork End product. The demand for this part is quite large, making it a tough task for the Mori Seiki NH4000 DCG machine. But because the breakdown of the machine is high enough to cause production targets every month are often not met. In addition, Maintenance activities that have not noticed the characteristics of engine damage, as well as the distribution of historical data of the machine causing less effective and efficient actions resulted in substantial Maintenance costs. Based on the results of risk analysis of Mori Seiki NH4000 DCG engine damage, in terms of performance loss system caused by a large enough that is 3.773% of machine production capacity per year. This figure exceeds the risk acceptance criteria by the company that is 2%. Therefore it is necessary to find the appropriate Maintenance policy for the Mori Seiki NH4000 DCG machine. The approach is to use Reliability Centeres Maintenance and Risk Based Maintenance. Based on the above two approaches obtained the appropriate interval time so that the Maintenance activities more effective and can improve the efficiency of treatment by reducing the cost of care previously Rp167.506.286, - per year, to Rp 96.147.061, - per year. With the policy is expected to reduce engine breakdown and performance loss caused. So the number of risks that arise for the future are within the criteria of acceptance set by the company.   Keywords: Preventive Maintenance, Reliability centered Maintenance, risk based Maintenance, Performance loss
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信