通过拆分作业减少全局调度下的延迟

J. Erickson, James H. Anderson
{"title":"通过拆分作业减少全局调度下的延迟","authors":"J. Erickson, James H. Anderson","doi":"10.1109/ECRTS.2013.13","DOIUrl":null,"url":null,"abstract":"Under current analysis, soft real-time tardiness bounds applicable to global earliest-deadline-first scheduling and related policies depend on per-task worst-case execution times. By splitting job budgets to create sub jobs with shorter periods and worst-case execution times, such bounds can be reduced to near zero for implicit-deadline sporadic task systems. However, doing so could potentially cause more preemptions and create problems for synchronization protocols. This paper analyzes this tradeoff between theory and practice by presenting an overhead-aware schedulability study pertaining to job splitting. In this study, real overhead data from a scheduler implementation in LITMUSRT was factored into schedulability analysis. This study shows that despite practical issues affecting job splitting, it can still yield substantial reductions in tardiness bounds for soft real-time systems.","PeriodicalId":247550,"journal":{"name":"2013 25th Euromicro Conference on Real-Time Systems","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-07-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Reducing Tardiness under Global Scheduling by Splitting Jobs\",\"authors\":\"J. Erickson, James H. Anderson\",\"doi\":\"10.1109/ECRTS.2013.13\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Under current analysis, soft real-time tardiness bounds applicable to global earliest-deadline-first scheduling and related policies depend on per-task worst-case execution times. By splitting job budgets to create sub jobs with shorter periods and worst-case execution times, such bounds can be reduced to near zero for implicit-deadline sporadic task systems. However, doing so could potentially cause more preemptions and create problems for synchronization protocols. This paper analyzes this tradeoff between theory and practice by presenting an overhead-aware schedulability study pertaining to job splitting. In this study, real overhead data from a scheduler implementation in LITMUSRT was factored into schedulability analysis. This study shows that despite practical issues affecting job splitting, it can still yield substantial reductions in tardiness bounds for soft real-time systems.\",\"PeriodicalId\":247550,\"journal\":{\"name\":\"2013 25th Euromicro Conference on Real-Time Systems\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-07-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 25th Euromicro Conference on Real-Time Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ECRTS.2013.13\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 25th Euromicro Conference on Real-Time Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ECRTS.2013.13","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

根据目前的分析,适用于全局最早截止日期优先调度和相关策略的软实时延迟边界取决于每个任务的最坏情况执行时间。通过拆分作业预算来创建具有更短周期和最坏情况执行时间的子作业,对于隐式截止日期零星任务系统,这样的界限可以减少到接近于零。但是,这样做可能会导致更多的抢占,并为同步协议带来问题。本文通过提出一个与任务分割相关的开销感知可调度性研究,分析了理论与实践之间的权衡。在本研究中,来自LITMUSRT调度器实现的实际开销数据被纳入可调度性分析。这项研究表明,尽管存在影响作业分割的实际问题,它仍然可以大大减少软实时系统的延迟界限。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reducing Tardiness under Global Scheduling by Splitting Jobs
Under current analysis, soft real-time tardiness bounds applicable to global earliest-deadline-first scheduling and related policies depend on per-task worst-case execution times. By splitting job budgets to create sub jobs with shorter periods and worst-case execution times, such bounds can be reduced to near zero for implicit-deadline sporadic task systems. However, doing so could potentially cause more preemptions and create problems for synchronization protocols. This paper analyzes this tradeoff between theory and practice by presenting an overhead-aware schedulability study pertaining to job splitting. In this study, real overhead data from a scheduler implementation in LITMUSRT was factored into schedulability analysis. This study shows that despite practical issues affecting job splitting, it can still yield substantial reductions in tardiness bounds for soft real-time systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信