{"title":"中小型工程企业机床系统中最优投产批量的确定","authors":"","doi":"10.36652/0869-4931-2020-74-3-16-19","DOIUrl":null,"url":null,"abstract":"The methodology for determining the optimal start-up lot in the machine tool system for small and medium¬sized engineering enterprises is considered. The methodology based on a multi-product network, the Ford-Fulker- son algorithm and the developed integer-valued linear programming task is considered.\nKeywords: launch party; capacity determination task; Ford—Fulkerson algorithm; mathematical model; methodology for determining the optimal launch batch.","PeriodicalId":309803,"journal":{"name":"Automation. Modern Techologies","volume":"72 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Determination of the optimal launch batch in the machine tool system for small and medium-sized engineering\\nenterprises\",\"authors\":\"\",\"doi\":\"10.36652/0869-4931-2020-74-3-16-19\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The methodology for determining the optimal start-up lot in the machine tool system for small and medium¬sized engineering enterprises is considered. The methodology based on a multi-product network, the Ford-Fulker- son algorithm and the developed integer-valued linear programming task is considered.\\nKeywords: launch party; capacity determination task; Ford—Fulkerson algorithm; mathematical model; methodology for determining the optimal launch batch.\",\"PeriodicalId\":309803,\"journal\":{\"name\":\"Automation. Modern Techologies\",\"volume\":\"72 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Automation. Modern Techologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36652/0869-4931-2020-74-3-16-19\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Automation. Modern Techologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36652/0869-4931-2020-74-3-16-19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Determination of the optimal launch batch in the machine tool system for small and medium-sized engineering
enterprises
The methodology for determining the optimal start-up lot in the machine tool system for small and medium¬sized engineering enterprises is considered. The methodology based on a multi-product network, the Ford-Fulker- son algorithm and the developed integer-valued linear programming task is considered.
Keywords: launch party; capacity determination task; Ford—Fulkerson algorithm; mathematical model; methodology for determining the optimal launch batch.