{"title":"循环生产系统的优化:一种启发式方法","authors":"F. Chauvet, J. Herrmann, J. Proth","doi":"10.1109/TRA.2002.807529","DOIUrl":null,"url":null,"abstract":"In this paper, the expression \"production systems\" refers to flow shops, job shops, assembly systems, Kanban systems, and, in general, to any discrete event system which transforms raw material and/or components into products and/or components. Such a system is said to be cyclic if it provides the same sequence of products indefinitely. A schedule of a cyclic production system is defined as soon as the starting time of each operation on the related resource is known. It has been shown that, whatever the feasible schedule applied to the cyclic production system, it is always possible to fully utilize the bottleneck resource. In other words, it is always possible to maximize the throughput of such a system. As a consequence, we aim at finding the schedule which permits to maximize the throughput with a work in process as small as possible. We propose a heuristic approach based on Petri nets to find a near-optimal, if not optimal, solution. We also give a sufficient condition for a solution to be optimal.","PeriodicalId":161449,"journal":{"name":"IEEE Trans. Robotics Autom.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2003-02-19","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":"{\"title\":\"Optimization of cyclic production systems: a heuristic approach\",\"authors\":\"F. Chauvet, J. Herrmann, J. Proth\",\"doi\":\"10.1109/TRA.2002.807529\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, the expression \\\"production systems\\\" refers to flow shops, job shops, assembly systems, Kanban systems, and, in general, to any discrete event system which transforms raw material and/or components into products and/or components. Such a system is said to be cyclic if it provides the same sequence of products indefinitely. A schedule of a cyclic production system is defined as soon as the starting time of each operation on the related resource is known. It has been shown that, whatever the feasible schedule applied to the cyclic production system, it is always possible to fully utilize the bottleneck resource. In other words, it is always possible to maximize the throughput of such a system. As a consequence, we aim at finding the schedule which permits to maximize the throughput with a work in process as small as possible. We propose a heuristic approach based on Petri nets to find a near-optimal, if not optimal, solution. We also give a sufficient condition for a solution to be optimal.\",\"PeriodicalId\":161449,\"journal\":{\"name\":\"IEEE Trans. Robotics Autom.\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2003-02-19\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"27\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Trans. Robotics Autom.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TRA.2002.807529\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Trans. Robotics Autom.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TRA.2002.807529","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 27

摘要

在本文中,“生产系统”一词指的是流程车间、作业车间、装配系统、看板系统,一般来说,指的是将原材料和/或组件转化为产品和/或组件的任何离散事件系统。如果这种系统无限期地提供相同的产品序列,就说它是循环的。一旦相关资源上的每个操作的开始时间已知,就定义循环生产系统的计划。研究表明,在循环生产系统中,无论采用何种可行的生产计划,瓶颈资源都有可能得到充分利用。换句话说,总是有可能最大化这样一个系统的吞吐量。因此,我们的目标是找到一个允许在工作尽可能小的情况下最大限度地提高吞吐量的时间表。我们提出了一种基于Petri网的启发式方法来找到一个接近最优的,如果不是最优的解决方案。并给出了一个解为最优的充分条件。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimization of cyclic production systems: a heuristic approach
In this paper, the expression "production systems" refers to flow shops, job shops, assembly systems, Kanban systems, and, in general, to any discrete event system which transforms raw material and/or components into products and/or components. Such a system is said to be cyclic if it provides the same sequence of products indefinitely. A schedule of a cyclic production system is defined as soon as the starting time of each operation on the related resource is known. It has been shown that, whatever the feasible schedule applied to the cyclic production system, it is always possible to fully utilize the bottleneck resource. In other words, it is always possible to maximize the throughput of such a system. As a consequence, we aim at finding the schedule which permits to maximize the throughput with a work in process as small as possible. We propose a heuristic approach based on Petri nets to find a near-optimal, if not optimal, solution. We also give a sufficient condition for a solution to be optimal.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信