某小型无人机系统的维护规划及备品备件供应

D. McLellan, K. Schneider
{"title":"某小型无人机系统的维护规划及备品备件供应","authors":"D. McLellan, K. Schneider","doi":"10.1109/RAM.2017.7889755","DOIUrl":null,"url":null,"abstract":"This paper details a maintenance model for the Silver Fox Small Unmanned Aerial System. The system is comprised of a number of mission critical, modular components as well as a number of mission enhancing components. A typical system is deployed for 180 days and consists of one aircraft, a spares kit, and a hangar queen aircraft. A discrete event simulation model is developed to evaluate the effects of maintenance planning decisions and spare parts provisioning on aircraft availability. The model explores using both the parts from the spares kit and cannibalized parts from the hangar queen in order to keep the aircraft availability high. When a part fails, it is sent back to the United States for refurbishment which takes a certain amount of time. We investigate the effects of spare parts provisioning, allowable maintenance time, and refurbishment lead time on several metrics. We show that changes in these policies have a significant impact on aircraft availability and capability.","PeriodicalId":138871,"journal":{"name":"2017 Annual Reliability and Maintainability Symposium (RAMS)","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Maintenance planning and spare parts provisioning for a small unmanned aerial system\",\"authors\":\"D. McLellan, K. Schneider\",\"doi\":\"10.1109/RAM.2017.7889755\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper details a maintenance model for the Silver Fox Small Unmanned Aerial System. The system is comprised of a number of mission critical, modular components as well as a number of mission enhancing components. A typical system is deployed for 180 days and consists of one aircraft, a spares kit, and a hangar queen aircraft. A discrete event simulation model is developed to evaluate the effects of maintenance planning decisions and spare parts provisioning on aircraft availability. The model explores using both the parts from the spares kit and cannibalized parts from the hangar queen in order to keep the aircraft availability high. When a part fails, it is sent back to the United States for refurbishment which takes a certain amount of time. We investigate the effects of spare parts provisioning, allowable maintenance time, and refurbishment lead time on several metrics. We show that changes in these policies have a significant impact on aircraft availability and capability.\",\"PeriodicalId\":138871,\"journal\":{\"name\":\"2017 Annual Reliability and Maintainability Symposium (RAMS)\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 Annual Reliability and Maintainability Symposium (RAMS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RAM.2017.7889755\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 Annual Reliability and Maintainability Symposium (RAMS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAM.2017.7889755","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文详细介绍了银狐小型无人机系统的维修模型。该系统由若干关键任务、模块化组件以及若干任务增强组件组成。典型的系统部署时间为180天,由一架飞机、一个备件套件和一架机库皇后飞机组成。建立了离散事件仿真模型,以评估维修计划决策和备件供应对飞机可用性的影响。该模型探索了使用备件套件中的部件和从机库皇后中拆下的部件,以保持飞机的高可用性。当一个零件出现故障时,它被送回美国进行翻新,这需要一定的时间。我们研究了备件供应、允许维护时间和翻新提前期对几个指标的影响。我们表明,这些政策的变化对飞机的可用性和能力有重大影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Maintenance planning and spare parts provisioning for a small unmanned aerial system
This paper details a maintenance model for the Silver Fox Small Unmanned Aerial System. The system is comprised of a number of mission critical, modular components as well as a number of mission enhancing components. A typical system is deployed for 180 days and consists of one aircraft, a spares kit, and a hangar queen aircraft. A discrete event simulation model is developed to evaluate the effects of maintenance planning decisions and spare parts provisioning on aircraft availability. The model explores using both the parts from the spares kit and cannibalized parts from the hangar queen in order to keep the aircraft availability high. When a part fails, it is sent back to the United States for refurbishment which takes a certain amount of time. We investigate the effects of spare parts provisioning, allowable maintenance time, and refurbishment lead time on several metrics. We show that changes in these policies have a significant impact on aircraft availability and capability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信