H. Kajiwara, H. Kimura, Ichiro Ishikawa, Hirofumi Yamada, Yuusuke Dakeshita, Shougo Nakashima
{"title":"基于RCPSP方法的船舶堆场工艺调度","authors":"H. Kajiwara, H. Kimura, Ichiro Ishikawa, Hirofumi Yamada, Yuusuke Dakeshita, Shougo Nakashima","doi":"10.2534/jjasnaoe.31.183","DOIUrl":null,"url":null,"abstract":"Summary First of all, the paper focuses the problem to construct a scheduling model of the stockyard in a shipyard in Japan, which should be verified by comparing the actual usage of facilities. Secondly it discusses the problem to apply the model to determine appropriate starting dates for block fabrication in assembly lines in order to achieve leveling of working hours. It is shown that these problems are formulated into RCPSP (Resource Constraint Project Scheduling Problem) and solved successfully using a software OptSeq(TM) developed by Prof. M. Kubo based on an RCPSP solver developed by Prof. K. Nonobe and Prof. T. Ibaraki.","PeriodicalId":192323,"journal":{"name":"Journal of the Japan Society of Naval Architects and Ocean Engineers","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Process Scheduling of a Shipbuilding Stockyard based on RCPSP Approach\",\"authors\":\"H. Kajiwara, H. Kimura, Ichiro Ishikawa, Hirofumi Yamada, Yuusuke Dakeshita, Shougo Nakashima\",\"doi\":\"10.2534/jjasnaoe.31.183\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Summary First of all, the paper focuses the problem to construct a scheduling model of the stockyard in a shipyard in Japan, which should be verified by comparing the actual usage of facilities. Secondly it discusses the problem to apply the model to determine appropriate starting dates for block fabrication in assembly lines in order to achieve leveling of working hours. It is shown that these problems are formulated into RCPSP (Resource Constraint Project Scheduling Problem) and solved successfully using a software OptSeq(TM) developed by Prof. M. Kubo based on an RCPSP solver developed by Prof. K. Nonobe and Prof. T. Ibaraki.\",\"PeriodicalId\":192323,\"journal\":{\"name\":\"Journal of the Japan Society of Naval Architects and Ocean Engineers\",\"volume\":\"29 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of the Japan Society of Naval Architects and Ocean Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2534/jjasnaoe.31.183\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Japan Society of Naval Architects and Ocean Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2534/jjasnaoe.31.183","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Process Scheduling of a Shipbuilding Stockyard based on RCPSP Approach
Summary First of all, the paper focuses the problem to construct a scheduling model of the stockyard in a shipyard in Japan, which should be verified by comparing the actual usage of facilities. Secondly it discusses the problem to apply the model to determine appropriate starting dates for block fabrication in assembly lines in order to achieve leveling of working hours. It is shown that these problems are formulated into RCPSP (Resource Constraint Project Scheduling Problem) and solved successfully using a software OptSeq(TM) developed by Prof. M. Kubo based on an RCPSP solver developed by Prof. K. Nonobe and Prof. T. Ibaraki.