{"title":"美洲第一个符合IEC61850标准的变电站投入使用","authors":"J. Rodrigues, L. Soldani, G. Wong","doi":"10.1109/TDCLA.2006.311500","DOIUrl":null,"url":null,"abstract":"The first substation in operation using IEC61850 in the Americas was Bujama of Luz del Sur in Peru. In this substation the standard was applied and fulfils all the requirements for substation automation. This paper describes this substation and the equipment","PeriodicalId":406067,"journal":{"name":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"First Substation with IEC61850 Commissioned in the Americas\",\"authors\":\"J. Rodrigues, L. Soldani, G. Wong\",\"doi\":\"10.1109/TDCLA.2006.311500\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The first substation in operation using IEC61850 in the Americas was Bujama of Luz del Sur in Peru. In this substation the standard was applied and fulfils all the requirements for substation automation. This paper describes this substation and the equipment\",\"PeriodicalId\":406067,\"journal\":{\"name\":\"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America\",\"volume\":\"35 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2006-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLA.2006.311500\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 IEEE/PES Transmission & Distribution Conference and Exposition: Latin America","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLA.2006.311500","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
First Substation with IEC61850 Commissioned in the Americas
The first substation in operation using IEC61850 in the Americas was Bujama of Luz del Sur in Peru. In this substation the standard was applied and fulfils all the requirements for substation automation. This paper describes this substation and the equipment