放松管制电力系统交易成本分配的分析方法

S. Jeyasankari, J. J. D. Nesamalar, S. Raja, P. Venkatesh
{"title":"放松管制电力系统交易成本分配的分析方法","authors":"S. Jeyasankari, J. J. D. Nesamalar, S. Raja, P. Venkatesh","doi":"10.1109/ICEETS.2013.6533539","DOIUrl":null,"url":null,"abstract":"In the new deregulated environment, transmission cost allocation is one of the major challenges due to the increase of power transactions in transmission open access faced by the electric power sector. In this paper, Transaction Impact Factors (TIFs) are developed with respect to each transaction and used for the allocation of usage based transmission transaction costs. These factors relate the real power flow in the lines with the transacted power. This analytical method provides the impact of line flows without running power flow solution when the amount of transacted power changes in real time. The proposed method is evaluated by considering bilateral and multilateral transactions, and compared with Megawatt Modulus (MM) method on sample six bus and IEEE 30 bus systems.","PeriodicalId":319201,"journal":{"name":"2013 International Conference on Energy Efficient Technologies for Sustainability","volume":"72 7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-04-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Transaction cost allocation in deregulated power system using an analytical method\",\"authors\":\"S. Jeyasankari, J. J. D. Nesamalar, S. Raja, P. Venkatesh\",\"doi\":\"10.1109/ICEETS.2013.6533539\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the new deregulated environment, transmission cost allocation is one of the major challenges due to the increase of power transactions in transmission open access faced by the electric power sector. In this paper, Transaction Impact Factors (TIFs) are developed with respect to each transaction and used for the allocation of usage based transmission transaction costs. These factors relate the real power flow in the lines with the transacted power. This analytical method provides the impact of line flows without running power flow solution when the amount of transacted power changes in real time. The proposed method is evaluated by considering bilateral and multilateral transactions, and compared with Megawatt Modulus (MM) method on sample six bus and IEEE 30 bus systems.\",\"PeriodicalId\":319201,\"journal\":{\"name\":\"2013 International Conference on Energy Efficient Technologies for Sustainability\",\"volume\":\"72 7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-04-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 International Conference on Energy Efficient Technologies for Sustainability\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICEETS.2013.6533539\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 International Conference on Energy Efficient Technologies for Sustainability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEETS.2013.6533539","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

在放松管制的新环境下,输电成本分配是输电开放接入中电力交易增加所面临的主要挑战之一。在本文中,交易影响因子(TIFs)被开发相对于每一个交易,并用于分配基于使用的传输交易成本。这些因素将线路中的实际潮流与交易功率联系起来。该分析方法提供了当交易电量实时变化时,不运行潮流的线流影响的解决方案。通过考虑双边和多边交易对该方法进行了评估,并在样本6总线和IEEE 30总线系统上与兆瓦模量(MM)方法进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Transaction cost allocation in deregulated power system using an analytical method
In the new deregulated environment, transmission cost allocation is one of the major challenges due to the increase of power transactions in transmission open access faced by the electric power sector. In this paper, Transaction Impact Factors (TIFs) are developed with respect to each transaction and used for the allocation of usage based transmission transaction costs. These factors relate the real power flow in the lines with the transacted power. This analytical method provides the impact of line flows without running power flow solution when the amount of transacted power changes in real time. The proposed method is evaluated by considering bilateral and multilateral transactions, and compared with Megawatt Modulus (MM) method on sample six bus and IEEE 30 bus systems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信