W. Langley, R. Gilmour, J. Turnham, G. Forbes, T. Mostert
{"title":"联邦大桥质量管理计划","authors":"W. Langley, R. Gilmour, J. Turnham, G. Forbes, T. Mostert","doi":"10.14359/6091","DOIUrl":null,"url":null,"abstract":"This paper presents an overview of the Quality Assurance and Quality Control for the construction of the Confederation Bridge in Eastern Canada. The bridge was unique not only in that it was designed, financed, constructed and operated by the private sector but also in the innovative approach to the design and construction. Private sector partnering with Government was a relatively new concept in Canada, and this project was an excellent of the merits of such ventures. The design life of the Confederation Bridge is 100 years with a target reliability index, Beta, of 4.0. The contractor implemented a rigid Quality Management Plan (QMP) to ensure that the factors which impact on durability and service life were documented and that the specifications were met or exceeded.","PeriodicalId":109987,"journal":{"name":"SP-171: Third CANMET/ACI International Symposium on Advances in Concrete Technology","volume":"35 18 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1997-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Quality Management Plan for the Confederation Bridge\",\"authors\":\"W. Langley, R. Gilmour, J. Turnham, G. Forbes, T. Mostert\",\"doi\":\"10.14359/6091\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper presents an overview of the Quality Assurance and Quality Control for the construction of the Confederation Bridge in Eastern Canada. The bridge was unique not only in that it was designed, financed, constructed and operated by the private sector but also in the innovative approach to the design and construction. Private sector partnering with Government was a relatively new concept in Canada, and this project was an excellent of the merits of such ventures. The design life of the Confederation Bridge is 100 years with a target reliability index, Beta, of 4.0. The contractor implemented a rigid Quality Management Plan (QMP) to ensure that the factors which impact on durability and service life were documented and that the specifications were met or exceeded.\",\"PeriodicalId\":109987,\"journal\":{\"name\":\"SP-171: Third CANMET/ACI International Symposium on Advances in Concrete Technology\",\"volume\":\"35 18 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1997-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SP-171: Third CANMET/ACI International Symposium on Advances in Concrete Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14359/6091\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SP-171: Third CANMET/ACI International Symposium on Advances in Concrete Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14359/6091","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Quality Management Plan for the Confederation Bridge
This paper presents an overview of the Quality Assurance and Quality Control for the construction of the Confederation Bridge in Eastern Canada. The bridge was unique not only in that it was designed, financed, constructed and operated by the private sector but also in the innovative approach to the design and construction. Private sector partnering with Government was a relatively new concept in Canada, and this project was an excellent of the merits of such ventures. The design life of the Confederation Bridge is 100 years with a target reliability index, Beta, of 4.0. The contractor implemented a rigid Quality Management Plan (QMP) to ensure that the factors which impact on durability and service life were documented and that the specifications were met or exceeded.