{"title":"双节点串联生产线产量的可变性","authors":"Y. Shin, D. Moon","doi":"10.1145/3016032.3016058","DOIUrl":null,"url":null,"abstract":"The second order measures such as the variance and covariance of the output process in a production system are very useful to design and control the systems in a more effective way. This paper concerns to the two-station system with a buffer of finite capacity. An effective method for evaluating the second moments of the number of outputs and inter-departure times is provided and the effects of the system parameters such as the buffer capacity and the variabilities of the processing time, failure time and repair time to the variability of output processes is investigated. Some applications of the results are also discussed.","PeriodicalId":269685,"journal":{"name":"Proceedings of the 11th International Conference on Queueing Theory and Network Applications","volume":"119 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Variability of output in two-node tandem production line\",\"authors\":\"Y. Shin, D. Moon\",\"doi\":\"10.1145/3016032.3016058\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The second order measures such as the variance and covariance of the output process in a production system are very useful to design and control the systems in a more effective way. This paper concerns to the two-station system with a buffer of finite capacity. An effective method for evaluating the second moments of the number of outputs and inter-departure times is provided and the effects of the system parameters such as the buffer capacity and the variabilities of the processing time, failure time and repair time to the variability of output processes is investigated. Some applications of the results are also discussed.\",\"PeriodicalId\":269685,\"journal\":{\"name\":\"Proceedings of the 11th International Conference on Queueing Theory and Network Applications\",\"volume\":\"119 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-12-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 11th International Conference on Queueing Theory and Network Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/3016032.3016058\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 11th International Conference on Queueing Theory and Network Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3016032.3016058","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Variability of output in two-node tandem production line
The second order measures such as the variance and covariance of the output process in a production system are very useful to design and control the systems in a more effective way. This paper concerns to the two-station system with a buffer of finite capacity. An effective method for evaluating the second moments of the number of outputs and inter-departure times is provided and the effects of the system parameters such as the buffer capacity and the variabilities of the processing time, failure time and repair time to the variability of output processes is investigated. Some applications of the results are also discussed.