自动化集装箱码头独立船闸站布置的仿真研究

Baohui Dong, Yu Zhang, Rong Yang, Yanhui Gao, Kun Zhou
{"title":"自动化集装箱码头独立船闸站布置的仿真研究","authors":"Baohui Dong, Yu Zhang, Rong Yang, Yanhui Gao, Kun Zhou","doi":"10.1109/ICTIS54573.2021.9798536","DOIUrl":null,"url":null,"abstract":"Lock station layout affects the efficiency of automated container terminal operations. For this reason, a lock station layout strategy must be studied to solve the problem. In this work, based on the traditional lock station layout strategy, we propose a separate lock station layout strategy in which the lock station, QC (Quay Crane) and yard are physically isolated, and the lock station no longer occupies the lane of QC operation area. The simulation results demonstrates that the separated lock station layout strategy can reduce the average waiting time of ART (Artificial Intelligence Robot of Transportation) at the lock station by 99%, and increase the lock station utilization by 22%, which has good practical application value, compared with the traditional method.","PeriodicalId":253824,"journal":{"name":"2021 6th International Conference on Transportation Information and Safety (ICTIS)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulation Study on Layout of Separate Lock Station in Automated Container Terminal\",\"authors\":\"Baohui Dong, Yu Zhang, Rong Yang, Yanhui Gao, Kun Zhou\",\"doi\":\"10.1109/ICTIS54573.2021.9798536\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Lock station layout affects the efficiency of automated container terminal operations. For this reason, a lock station layout strategy must be studied to solve the problem. In this work, based on the traditional lock station layout strategy, we propose a separate lock station layout strategy in which the lock station, QC (Quay Crane) and yard are physically isolated, and the lock station no longer occupies the lane of QC operation area. The simulation results demonstrates that the separated lock station layout strategy can reduce the average waiting time of ART (Artificial Intelligence Robot of Transportation) at the lock station by 99%, and increase the lock station utilization by 22%, which has good practical application value, compared with the traditional method.\",\"PeriodicalId\":253824,\"journal\":{\"name\":\"2021 6th International Conference on Transportation Information and Safety (ICTIS)\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-10-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 6th International Conference on Transportation Information and Safety (ICTIS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICTIS54573.2021.9798536\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 6th International Conference on Transportation Information and Safety (ICTIS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICTIS54573.2021.9798536","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

锁站布局影响着集装箱码头自动化作业的效率。因此,必须研究一种锁站布局策略来解决这个问题。本工作在传统锁站布局策略的基础上,提出了锁站、QC (Quay Crane)和堆场物理隔离的独立锁站布局策略,锁站不再占用QC作业区域的车道。仿真结果表明,与传统方法相比,分离式锁站布局策略可使锁站人工智能机器人(ART)的平均等待时间减少99%,锁站利用率提高22%,具有较好的实际应用价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Simulation Study on Layout of Separate Lock Station in Automated Container Terminal
Lock station layout affects the efficiency of automated container terminal operations. For this reason, a lock station layout strategy must be studied to solve the problem. In this work, based on the traditional lock station layout strategy, we propose a separate lock station layout strategy in which the lock station, QC (Quay Crane) and yard are physically isolated, and the lock station no longer occupies the lane of QC operation area. The simulation results demonstrates that the separated lock station layout strategy can reduce the average waiting time of ART (Artificial Intelligence Robot of Transportation) at the lock station by 99%, and increase the lock station utilization by 22%, which has good practical application value, compared with the traditional method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信