实现新能源和可再生能源目标:以印尼爪哇-巴厘电力系统为例

Sarjiya, Rizki Firmansyah Setya Budi, Lesnanto Putra Multanto
{"title":"实现新能源和可再生能源目标:以印尼爪哇-巴厘电力系统为例","authors":"Sarjiya, Rizki Firmansyah Setya Budi, Lesnanto Putra Multanto","doi":"10.1109/SPIES48661.2020.9242984","DOIUrl":null,"url":null,"abstract":"New and renewable energy (N&RE) become alternative energy to reduce the dependency on fossil energy in the power sector. However, many countries have encountered obstacles in the process of reducing dependency. The obstacles that arise are very specific depending on the conditions of the country. Therefore, the strategies are taken by each country also different. An example is in Indonesia. Indonesia’s National Energy Policy (NEP) has a mandate to achieve N&RE target of 23% in 2025 and 31% in 2050. Because of the unique characteristic of Indonesia, the strategies to achieve these targets differ from other countries. This research used the Java-Bali power system in Indonesia as a case study to find the strategies. A generation expansion planning (GEP) by considering alternative strategies to achieve the target in Java-Bali has been conducted. This research used the MoMANI-OSeMOSYS as a GEP model. Three scenarios have been developed: business as usual (BAU), renewable energy (RE), and new and renewable energy (N&RE) scenario. The results show that the implementation of the N&RE target causes the generation cost increase and the CO2 emission decrease. Achieving the N&RE target requires the role of nuclear energy.","PeriodicalId":244426,"journal":{"name":"2020 2nd International Conference on Smart Power & Internet Energy Systems (SPIES)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Achieving New and Renewable Energy Target: A Case Study of Java-Bali Power System, Indonesia\",\"authors\":\"Sarjiya, Rizki Firmansyah Setya Budi, Lesnanto Putra Multanto\",\"doi\":\"10.1109/SPIES48661.2020.9242984\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"New and renewable energy (N&RE) become alternative energy to reduce the dependency on fossil energy in the power sector. However, many countries have encountered obstacles in the process of reducing dependency. The obstacles that arise are very specific depending on the conditions of the country. Therefore, the strategies are taken by each country also different. An example is in Indonesia. Indonesia’s National Energy Policy (NEP) has a mandate to achieve N&RE target of 23% in 2025 and 31% in 2050. Because of the unique characteristic of Indonesia, the strategies to achieve these targets differ from other countries. This research used the Java-Bali power system in Indonesia as a case study to find the strategies. A generation expansion planning (GEP) by considering alternative strategies to achieve the target in Java-Bali has been conducted. This research used the MoMANI-OSeMOSYS as a GEP model. Three scenarios have been developed: business as usual (BAU), renewable energy (RE), and new and renewable energy (N&RE) scenario. The results show that the implementation of the N&RE target causes the generation cost increase and the CO2 emission decrease. Achieving the N&RE target requires the role of nuclear energy.\",\"PeriodicalId\":244426,\"journal\":{\"name\":\"2020 2nd International Conference on Smart Power & Internet Energy Systems (SPIES)\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 2nd International Conference on Smart Power & Internet Energy Systems (SPIES)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SPIES48661.2020.9242984\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 2nd International Conference on Smart Power & Internet Energy Systems (SPIES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SPIES48661.2020.9242984","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

新能源和可再生能源(N&RE)成为电力部门减少对化石能源依赖的替代能源。但是,许多国家在减少依赖的过程中遇到了障碍。所产生的障碍是非常具体的,视国家的情况而定。因此,每个国家所采取的策略也不同。印度尼西亚就是一个例子。印度尼西亚国家能源政策(NEP)的任务是在2025年实现23%和2050年31%的N&RE目标。由于印度尼西亚的独特特点,实现这些目标的战略不同于其他国家。本研究以印尼爪哇-巴厘电力系统为例,寻找策略。通过考虑实现爪哇-巴厘目标的替代战略,进行了一代扩展计划(GEP)。本研究使用MoMANI-OSeMOSYS作为GEP模型。已经开发了三种情景:照常营业(BAU)、可再生能源(RE)和新能源和可再生能源(N&RE)情景。结果表明,新能源与可再生能源目标的实施使发电成本增加,二氧化碳排放量减少。实现新能源和可再生能源目标需要核能的作用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Achieving New and Renewable Energy Target: A Case Study of Java-Bali Power System, Indonesia
New and renewable energy (N&RE) become alternative energy to reduce the dependency on fossil energy in the power sector. However, many countries have encountered obstacles in the process of reducing dependency. The obstacles that arise are very specific depending on the conditions of the country. Therefore, the strategies are taken by each country also different. An example is in Indonesia. Indonesia’s National Energy Policy (NEP) has a mandate to achieve N&RE target of 23% in 2025 and 31% in 2050. Because of the unique characteristic of Indonesia, the strategies to achieve these targets differ from other countries. This research used the Java-Bali power system in Indonesia as a case study to find the strategies. A generation expansion planning (GEP) by considering alternative strategies to achieve the target in Java-Bali has been conducted. This research used the MoMANI-OSeMOSYS as a GEP model. Three scenarios have been developed: business as usual (BAU), renewable energy (RE), and new and renewable energy (N&RE) scenario. The results show that the implementation of the N&RE target causes the generation cost increase and the CO2 emission decrease. Achieving the N&RE target requires the role of nuclear energy.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信