S. Sheu, Tzu-Hsin Liu, Wei-Teng Sheu, J. Ke, Zhe-George Zhang
{"title":"受冲击系统的二元替换策略","authors":"S. Sheu, Tzu-Hsin Liu, Wei-Teng Sheu, J. Ke, Zhe-George Zhang","doi":"10.1080/16843703.2023.2165287","DOIUrl":null,"url":null,"abstract":"ABSTRACT A bivariate replacement policy for a two-unit system under the shock-effect is studied. Unit 1 is subject to one of the two types of shocks. A type 1 shock causes a minor failure of unit 1, while a type 2 shock makes a catastrophic failure of unit 1. The probabilities of the shock types depend on the number of shocks since the last replacement. Each minor failure of unit 1 brings some cumulative damage to unit 2. When the cumulative damage of unit 2 reaches L, unit 2 fails, which simultaneously causes the failure of unit 1, resulting in a catastrophic failure of system. Moreover, unit 2 with cumulative damage x has a minor failure with probability at unit 1 failure instant, and this failure is removed by a minimal repair. A more general replacement policy is considered, in which the system is replaced when the cumulative damage to unit 2 has reached l (≤ L), or the nth type 1 shock occurs, or when type 2 shock occurs or the accumulative damage to unit 2 exceeds L, whichever comes first. The expression for average cost rate is developed and the corresponding optimal policy is determined analytically and numerically.","PeriodicalId":229439,"journal":{"name":"Quality Technology & Quantitative Management","volume":"118 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Bivariate replacement policy for a system subject to shocks\",\"authors\":\"S. Sheu, Tzu-Hsin Liu, Wei-Teng Sheu, J. Ke, Zhe-George Zhang\",\"doi\":\"10.1080/16843703.2023.2165287\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACT A bivariate replacement policy for a two-unit system under the shock-effect is studied. Unit 1 is subject to one of the two types of shocks. A type 1 shock causes a minor failure of unit 1, while a type 2 shock makes a catastrophic failure of unit 1. The probabilities of the shock types depend on the number of shocks since the last replacement. Each minor failure of unit 1 brings some cumulative damage to unit 2. When the cumulative damage of unit 2 reaches L, unit 2 fails, which simultaneously causes the failure of unit 1, resulting in a catastrophic failure of system. Moreover, unit 2 with cumulative damage x has a minor failure with probability at unit 1 failure instant, and this failure is removed by a minimal repair. A more general replacement policy is considered, in which the system is replaced when the cumulative damage to unit 2 has reached l (≤ L), or the nth type 1 shock occurs, or when type 2 shock occurs or the accumulative damage to unit 2 exceeds L, whichever comes first. The expression for average cost rate is developed and the corresponding optimal policy is determined analytically and numerically.\",\"PeriodicalId\":229439,\"journal\":{\"name\":\"Quality Technology & Quantitative Management\",\"volume\":\"118 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Quality Technology & Quantitative Management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/16843703.2023.2165287\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Quality Technology & Quantitative Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/16843703.2023.2165287","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Bivariate replacement policy for a system subject to shocks
ABSTRACT A bivariate replacement policy for a two-unit system under the shock-effect is studied. Unit 1 is subject to one of the two types of shocks. A type 1 shock causes a minor failure of unit 1, while a type 2 shock makes a catastrophic failure of unit 1. The probabilities of the shock types depend on the number of shocks since the last replacement. Each minor failure of unit 1 brings some cumulative damage to unit 2. When the cumulative damage of unit 2 reaches L, unit 2 fails, which simultaneously causes the failure of unit 1, resulting in a catastrophic failure of system. Moreover, unit 2 with cumulative damage x has a minor failure with probability at unit 1 failure instant, and this failure is removed by a minimal repair. A more general replacement policy is considered, in which the system is replaced when the cumulative damage to unit 2 has reached l (≤ L), or the nth type 1 shock occurs, or when type 2 shock occurs or the accumulative damage to unit 2 exceeds L, whichever comes first. The expression for average cost rate is developed and the corresponding optimal policy is determined analytically and numerically.