M. Almaktar, M. Y. Hassan, M. Abdullah, F. Hussin, M. Majid
{"title":"联合电力市场中输电使用和损耗的收费","authors":"M. Almaktar, M. Y. Hassan, M. Abdullah, F. Hussin, M. Majid","doi":"10.1109/PEOCO.2010.5559215","DOIUrl":null,"url":null,"abstract":"This paper reviews different approaches on allocation of transmission usage and losses among the pool market's participants. Different pricing methods are also investigated to cover the total transmission system cost as well as charge for transmission losses among network utilities. Results of 5-bus system are reported to show the recovery of the total transmission cost as well as allocation of losses among users in pool electricity market.","PeriodicalId":379868,"journal":{"name":"2010 4th International Power Engineering and Optimization Conference (PEOCO)","volume":"140 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Charge of transmission usage and losses in pool electricity market\",\"authors\":\"M. Almaktar, M. Y. Hassan, M. Abdullah, F. Hussin, M. Majid\",\"doi\":\"10.1109/PEOCO.2010.5559215\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper reviews different approaches on allocation of transmission usage and losses among the pool market's participants. Different pricing methods are also investigated to cover the total transmission system cost as well as charge for transmission losses among network utilities. Results of 5-bus system are reported to show the recovery of the total transmission cost as well as allocation of losses among users in pool electricity market.\",\"PeriodicalId\":379868,\"journal\":{\"name\":\"2010 4th International Power Engineering and Optimization Conference (PEOCO)\",\"volume\":\"140 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-06-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 4th International Power Engineering and Optimization Conference (PEOCO)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PEOCO.2010.5559215\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 4th International Power Engineering and Optimization Conference (PEOCO)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PEOCO.2010.5559215","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Charge of transmission usage and losses in pool electricity market
This paper reviews different approaches on allocation of transmission usage and losses among the pool market's participants. Different pricing methods are also investigated to cover the total transmission system cost as well as charge for transmission losses among network utilities. Results of 5-bus system are reported to show the recovery of the total transmission cost as well as allocation of losses among users in pool electricity market.