基于序列的工程项目常态性分析与表征方法

Lei Shi, J. Gopsill, L. Newnes, S. Culley
{"title":"基于序列的工程项目常态性分析与表征方法","authors":"Lei Shi, J. Gopsill, L. Newnes, S. Culley","doi":"10.1109/ICTAI.2014.146","DOIUrl":null,"url":null,"abstract":"Engineering projects are often highly complex, unique and safety critical, which can lead to the complex engineering processes and activity. To ensure the success of engineering projects, the projects often have to comply with stringent regulations and company processes. In addition, the increasing in-service lifespan of products has led to an increase in the number of re-design and maintenance projects. These are often run concurrently in a highly time-constrained and high-pressured environment, which has led to the monitoring of the sequence of engineering activity becoming difficult. This is because, the sequence of engineering activity is typically achieved through the ability of the project managers to use their knowledge, experience and constant contact with the engineers. However, the viability of the current method to manually generate and evaluate the activity plan is becoming an issue due to the increasing number and distributed nature of these projects. As regulatory and/or company process demands, the data relating to the project is often archived and thus, provides a wealth of potentially useful information that could be utilised in the management of current projects. Therefore, this research investigates the potential value provided by the automatic construction of past project activity sequences, and proposes analytical methods to represent the normality of project activity based on the extracted patterns from their sequences. The evaluation applies industrial data, and shows that the results generated by the proposed approach can accurately reflect the similarity and normality of the projects.","PeriodicalId":142794,"journal":{"name":"2014 IEEE 26th International Conference on Tools with Artificial Intelligence","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":"{\"title\":\"A Sequence-Based Approach to Analysing and Representing Engineering Project Normality\",\"authors\":\"Lei Shi, J. Gopsill, L. Newnes, S. Culley\",\"doi\":\"10.1109/ICTAI.2014.146\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Engineering projects are often highly complex, unique and safety critical, which can lead to the complex engineering processes and activity. To ensure the success of engineering projects, the projects often have to comply with stringent regulations and company processes. In addition, the increasing in-service lifespan of products has led to an increase in the number of re-design and maintenance projects. These are often run concurrently in a highly time-constrained and high-pressured environment, which has led to the monitoring of the sequence of engineering activity becoming difficult. This is because, the sequence of engineering activity is typically achieved through the ability of the project managers to use their knowledge, experience and constant contact with the engineers. However, the viability of the current method to manually generate and evaluate the activity plan is becoming an issue due to the increasing number and distributed nature of these projects. As regulatory and/or company process demands, the data relating to the project is often archived and thus, provides a wealth of potentially useful information that could be utilised in the management of current projects. Therefore, this research investigates the potential value provided by the automatic construction of past project activity sequences, and proposes analytical methods to represent the normality of project activity based on the extracted patterns from their sequences. The evaluation applies industrial data, and shows that the results generated by the proposed approach can accurately reflect the similarity and normality of the projects.\",\"PeriodicalId\":142794,\"journal\":{\"name\":\"2014 IEEE 26th International Conference on Tools with Artificial Intelligence\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-11-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"10\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE 26th International Conference on Tools with Artificial Intelligence\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICTAI.2014.146\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE 26th International Conference on Tools with Artificial Intelligence","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICTAI.2014.146","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

摘要

工程项目通常是高度复杂、独特和安全关键的,这可能导致复杂的工程过程和活动。为了确保工程项目的成功,项目通常必须遵守严格的法规和公司流程。此外,产品使用寿命的增加导致重新设计和维护项目的数量增加。这些通常是在时间限制和高压的环境下同时进行的,这使得对工程活动顺序的监控变得困难。这是因为,工程活动的顺序通常是通过项目经理运用他们的知识、经验和与工程师的不断接触的能力来实现的。然而,由于这些项目的数量和分布性质的增加,目前手工生成和评估活动计划的方法的可行性正在成为一个问题。由于法规和/或公司流程的要求,与项目有关的数据经常被存档,因此,提供了大量潜在有用的信息,可以在当前项目的管理中使用。因此,本研究探讨了自动构建过去项目活动序列所提供的潜在价值,并提出了基于从项目活动序列中提取的模式来表示项目活动正态性的分析方法。应用工业数据进行评价,结果表明该方法能准确反映项目的相似性和正态性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Sequence-Based Approach to Analysing and Representing Engineering Project Normality
Engineering projects are often highly complex, unique and safety critical, which can lead to the complex engineering processes and activity. To ensure the success of engineering projects, the projects often have to comply with stringent regulations and company processes. In addition, the increasing in-service lifespan of products has led to an increase in the number of re-design and maintenance projects. These are often run concurrently in a highly time-constrained and high-pressured environment, which has led to the monitoring of the sequence of engineering activity becoming difficult. This is because, the sequence of engineering activity is typically achieved through the ability of the project managers to use their knowledge, experience and constant contact with the engineers. However, the viability of the current method to manually generate and evaluate the activity plan is becoming an issue due to the increasing number and distributed nature of these projects. As regulatory and/or company process demands, the data relating to the project is often archived and thus, provides a wealth of potentially useful information that could be utilised in the management of current projects. Therefore, this research investigates the potential value provided by the automatic construction of past project activity sequences, and proposes analytical methods to represent the normality of project activity based on the extracted patterns from their sequences. The evaluation applies industrial data, and shows that the results generated by the proposed approach can accurately reflect the similarity and normality of the projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信