使用CAMPBELL DUDEK SMITH方法(在PT. XYZ)生产进度优化

Fathurohman, M. Sayuti, Alexander Lambas T
{"title":"使用CAMPBELL DUDEK SMITH方法(在PT. XYZ)生产进度优化","authors":"Fathurohman, M. Sayuti, Alexander Lambas T","doi":"10.36805/teknikindustri.v5i2.1126","DOIUrl":null,"url":null,"abstract":"Scheduling is the allocation of limited resources to do a number of jobs. Problems arise when at certain stages of operation some or all of the work requires the same work station. PT XYZ is a service company engaged in electro plating, where the work process is carried out when receiving a request from the customer. The arrival of products from customers who are late and other things will affect the process of working on the products to be plated so that the schedule for sending back products that have been platted is not on schedule while the company does not have inventory. Therefore, a good production machine scheduling optimization will be able to produce good processing time. In addition to knowing the number of machines and jobs as well as the number and sequence of their production processes, research is also carried out by calculating the processing time of each job. Based on the comparison between the best iterations of CDS and the company's FSCS method, it is known that there is a difference in makespan time of 46990 seconds or about 13.05 hours and a flowtime difference of 216380 seconds or about 60.1 hours.","PeriodicalId":318629,"journal":{"name":"Industry Xplore","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"OPTIMASI PENJADWALAN PRODUKSI MENGGUNAKAN METODE CAMPBELL DUDEK SMITH (DI PT. XYZ)\",\"authors\":\"Fathurohman, M. Sayuti, Alexander Lambas T\",\"doi\":\"10.36805/teknikindustri.v5i2.1126\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Scheduling is the allocation of limited resources to do a number of jobs. Problems arise when at certain stages of operation some or all of the work requires the same work station. PT XYZ is a service company engaged in electro plating, where the work process is carried out when receiving a request from the customer. The arrival of products from customers who are late and other things will affect the process of working on the products to be plated so that the schedule for sending back products that have been platted is not on schedule while the company does not have inventory. Therefore, a good production machine scheduling optimization will be able to produce good processing time. In addition to knowing the number of machines and jobs as well as the number and sequence of their production processes, research is also carried out by calculating the processing time of each job. Based on the comparison between the best iterations of CDS and the company's FSCS method, it is known that there is a difference in makespan time of 46990 seconds or about 13.05 hours and a flowtime difference of 216380 seconds or about 60.1 hours.\",\"PeriodicalId\":318629,\"journal\":{\"name\":\"Industry Xplore\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Industry Xplore\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36805/teknikindustri.v5i2.1126\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Industry Xplore","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36805/teknikindustri.v5i2.1126","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

调度是将有限的资源分配给一定数量的工作。当在某些操作阶段,部分或全部工作需要同一工作站时,就会出现问题。PT XYZ是一家从事电镀的服务公司,当收到客户的要求时,工作过程就会进行。客户的产品迟到和其他事情会影响待镀产品的工作进程,因此在公司没有库存的情况下,退回已镀产品的计划无法如期进行。因此,良好的生产机器调度优化将能够生产出良好的加工时间。除了知道机器和工种的数量及其生产工序的数量和顺序外,还通过计算每个工种的加工时间来进行研究。通过对CDS的最佳迭代与公司的FSCS方法的比较可知,两者的最大跨度时间差异为46990秒(约13.05小时),流动时间差异为216380秒(约60.1小时)。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
OPTIMASI PENJADWALAN PRODUKSI MENGGUNAKAN METODE CAMPBELL DUDEK SMITH (DI PT. XYZ)
Scheduling is the allocation of limited resources to do a number of jobs. Problems arise when at certain stages of operation some or all of the work requires the same work station. PT XYZ is a service company engaged in electro plating, where the work process is carried out when receiving a request from the customer. The arrival of products from customers who are late and other things will affect the process of working on the products to be plated so that the schedule for sending back products that have been platted is not on schedule while the company does not have inventory. Therefore, a good production machine scheduling optimization will be able to produce good processing time. In addition to knowing the number of machines and jobs as well as the number and sequence of their production processes, research is also carried out by calculating the processing time of each job. Based on the comparison between the best iterations of CDS and the company's FSCS method, it is known that there is a difference in makespan time of 46990 seconds or about 13.05 hours and a flowtime difference of 216380 seconds or about 60.1 hours.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信