{"title":"基于仿真的钢铁厂多级流水车间设计方法","authors":"N. Ueno, S. Sotojima, J. Takeda","doi":"10.1109/SIMSYM.1991.151462","DOIUrl":null,"url":null,"abstract":"This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line.<<ETX>>","PeriodicalId":174131,"journal":{"name":"[1991] Proceedings of the 24th Annual Simulation Symposium","volume":"99 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulation-based approach to design a multi-stage flow-shop in steelworks\",\"authors\":\"N. Ueno, S. Sotojima, J. Takeda\",\"doi\":\"10.1109/SIMSYM.1991.151462\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line.<<ETX>>\",\"PeriodicalId\":174131,\"journal\":{\"name\":\"[1991] Proceedings of the 24th Annual Simulation Symposium\",\"volume\":\"99 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[1991] Proceedings of the 24th Annual Simulation Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIMSYM.1991.151462\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1991] Proceedings of the 24th Annual Simulation Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIMSYM.1991.151462","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Simulation-based approach to design a multi-stage flow-shop in steelworks
This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line.<>