基于仿真的钢铁厂多级流水车间设计方法

N. Ueno, S. Sotojima, J. Takeda
{"title":"基于仿真的钢铁厂多级流水车间设计方法","authors":"N. Ueno, S. Sotojima, J. Takeda","doi":"10.1109/SIMSYM.1991.151462","DOIUrl":null,"url":null,"abstract":"This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line.<<ETX>>","PeriodicalId":174131,"journal":{"name":"[1991] Proceedings of the 24th Annual Simulation Symposium","volume":"99 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Simulation-based approach to design a multi-stage flow-shop in steelworks\",\"authors\":\"N. Ueno, S. Sotojima, J. Takeda\",\"doi\":\"10.1109/SIMSYM.1991.151462\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line.<<ETX>>\",\"PeriodicalId\":174131,\"journal\":{\"name\":\"[1991] Proceedings of the 24th Annual Simulation Symposium\",\"volume\":\"99 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"[1991] Proceedings of the 24th Annual Simulation Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIMSYM.1991.151462\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1991] Proceedings of the 24th Annual Simulation Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIMSYM.1991.151462","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了一种新的基于仿真的多阶段流水车间生产线再设计方法。为了确定瓶颈,定义了代表机器“实际”生产率的性能度量。为了确定如何最好地缓解瓶颈,基于所提出的措施开发了一个仿真程序。将该方法应用于某钢厂实际大型多段流水车间生产线的重新设计,确定了以最小投资提高生产效率的生产线规格。这种方法对于多级流水车间生产线的重新设计是实用而有力的
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Simulation-based approach to design a multi-stage flow-shop in steelworks
This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信