改进燃煤电站高压电机状态监测与故障诊断策略

Katie Buttery, S. Alahakoon
{"title":"改进燃煤电站高压电机状态监测与故障诊断策略","authors":"Katie Buttery, S. Alahakoon","doi":"10.1109/AUPEC.2013.6725391","DOIUrl":null,"url":null,"abstract":"High voltage induction motors at Gladstone Power Station are roughly 30 years old and are a significant asset and critical component to the electricity generation process. Due to the criticality of the high voltage motors in the electricity process, age and environmental conditions the motors are exposed to, how can all the high voltage motors at Gladstone Power Station be maintained and monitored regularly and more effectively particularly between scheduled overhauls is an important issue. This paper outlines the process taken to assess the current condition of the high voltage motors and evaluate the maintenance strategy utilized at Gladstone Power Station. Thermography and thermal imaging was used to assess the current condition of the motors and assess the maintenance strategy utilized. From these result, thermography was recommended to be conducted on a regular basis in coordination with other condition monitoring techniques to monitor and track the condition of the high voltage motors during on-line conditions and in between the four yearly unit overhauls. This will increase proactive and preventative maintenance techniques and ensure Gladstone Power Station are aware of the condition of all of the high voltage motors to further maximize and optimize the stations output and assets.","PeriodicalId":121040,"journal":{"name":"2013 Australasian Universities Power Engineering Conference (AUPEC)","volume":"434 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Improving condition monitoring & fault diagnosis strategy for HV motors in coal fired power stations\",\"authors\":\"Katie Buttery, S. Alahakoon\",\"doi\":\"10.1109/AUPEC.2013.6725391\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"High voltage induction motors at Gladstone Power Station are roughly 30 years old and are a significant asset and critical component to the electricity generation process. Due to the criticality of the high voltage motors in the electricity process, age and environmental conditions the motors are exposed to, how can all the high voltage motors at Gladstone Power Station be maintained and monitored regularly and more effectively particularly between scheduled overhauls is an important issue. This paper outlines the process taken to assess the current condition of the high voltage motors and evaluate the maintenance strategy utilized at Gladstone Power Station. Thermography and thermal imaging was used to assess the current condition of the motors and assess the maintenance strategy utilized. From these result, thermography was recommended to be conducted on a regular basis in coordination with other condition monitoring techniques to monitor and track the condition of the high voltage motors during on-line conditions and in between the four yearly unit overhauls. This will increase proactive and preventative maintenance techniques and ensure Gladstone Power Station are aware of the condition of all of the high voltage motors to further maximize and optimize the stations output and assets.\",\"PeriodicalId\":121040,\"journal\":{\"name\":\"2013 Australasian Universities Power Engineering Conference (AUPEC)\",\"volume\":\"434 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 Australasian Universities Power Engineering Conference (AUPEC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/AUPEC.2013.6725391\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 Australasian Universities Power Engineering Conference (AUPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/AUPEC.2013.6725391","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

格拉德斯通发电站的高压感应电机大约有30年的历史,是发电过程中的重要资产和关键部件。由于高压电机在电力过程中的重要性,电机所处的年龄和环境条件,如何在格拉德斯通电站对所有高压电机进行定期和更有效的维护和监测,特别是在定期大修之间是一个重要问题。本文概述了评估格莱斯顿电站高压电机现状和评估维修策略的过程。使用热成像和热成像来评估电机的当前状态并评估所采用的维护策略。根据这些结果,建议在与其他状态监测技术协调的基础上定期进行热成像,以监测和跟踪高压电机在在线状态和四年一次的机组大修之间的状态。这将增加主动和预防性维护技术,并确保格拉德斯通电站了解所有高压电机的状况,以进一步最大化和优化电站的输出和资产。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improving condition monitoring & fault diagnosis strategy for HV motors in coal fired power stations
High voltage induction motors at Gladstone Power Station are roughly 30 years old and are a significant asset and critical component to the electricity generation process. Due to the criticality of the high voltage motors in the electricity process, age and environmental conditions the motors are exposed to, how can all the high voltage motors at Gladstone Power Station be maintained and monitored regularly and more effectively particularly between scheduled overhauls is an important issue. This paper outlines the process taken to assess the current condition of the high voltage motors and evaluate the maintenance strategy utilized at Gladstone Power Station. Thermography and thermal imaging was used to assess the current condition of the motors and assess the maintenance strategy utilized. From these result, thermography was recommended to be conducted on a regular basis in coordination with other condition monitoring techniques to monitor and track the condition of the high voltage motors during on-line conditions and in between the four yearly unit overhauls. This will increase proactive and preventative maintenance techniques and ensure Gladstone Power Station are aware of the condition of all of the high voltage motors to further maximize and optimize the stations output and assets.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信