{"title":"时间离散事件工厂中有效调度的模块化综合","authors":"R. Boel, F. J. Montoya","doi":"10.1109/CDC.2000.912725","DOIUrl":null,"url":null,"abstract":"Treats optimal scheduling in large timed discrete event systems as a supervisory control problem. Scheduling tasks in a steel plant are treated as a realistically sized case study. A sequence of tasks must be completed in as soon as possible, while satisfying all the constraints in the model. These different constraints are specified via different components in a modular plant representation. Components can be represented as timed Petri nets, leading to a graph of interacting modules. The acyclic nature of the graph consisting of the most critical components is exploited in order to find a heuristic but fast way of searching through the very large set of feasible orderings.","PeriodicalId":217237,"journal":{"name":"Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187)","volume":"894 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2000-12-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Modular synthesis of efficient schedules in a timed discrete event plant\",\"authors\":\"R. Boel, F. J. Montoya\",\"doi\":\"10.1109/CDC.2000.912725\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Treats optimal scheduling in large timed discrete event systems as a supervisory control problem. Scheduling tasks in a steel plant are treated as a realistically sized case study. A sequence of tasks must be completed in as soon as possible, while satisfying all the constraints in the model. These different constraints are specified via different components in a modular plant representation. Components can be represented as timed Petri nets, leading to a graph of interacting modules. The acyclic nature of the graph consisting of the most critical components is exploited in order to find a heuristic but fast way of searching through the very large set of feasible orderings.\",\"PeriodicalId\":217237,\"journal\":{\"name\":\"Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187)\",\"volume\":\"894 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2000-12-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CDC.2000.912725\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 39th IEEE Conference on Decision and Control (Cat. No.00CH37187)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDC.2000.912725","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modular synthesis of efficient schedules in a timed discrete event plant
Treats optimal scheduling in large timed discrete event systems as a supervisory control problem. Scheduling tasks in a steel plant are treated as a realistically sized case study. A sequence of tasks must be completed in as soon as possible, while satisfying all the constraints in the model. These different constraints are specified via different components in a modular plant representation. Components can be represented as timed Petri nets, leading to a graph of interacting modules. The acyclic nature of the graph consisting of the most critical components is exploited in order to find a heuristic but fast way of searching through the very large set of feasible orderings.