优化电力系统可靠性水平的经济标准

M. Munasinghe
{"title":"优化电力系统可靠性水平的经济标准","authors":"M. Munasinghe","doi":"10.2307/3003337","DOIUrl":null,"url":null,"abstract":"A generalized simulation model for optimizing the reliability level of electrical supply is described. The model is applied to a case study of Cascavel, Brazil to determine a range of optimum reliability levels for long range electric power distribution system planning. The basis of the model is its comparison of the social benefits and costs of changes in power system reliability. The supply side costs of increasing system reliability can be determined from straight forward engineering considerations. On the demand side, the benefits of electricity users consist of cost savings from averted power failures or outages, which may be measured by the disruption of the output streams owing to idle input factors and spoilage. The results of the Cascavel case study indicate that the principal outage costs are incurred by industrial and residential consumers. This fact is reflected in the optimum design of the distribution system, with the high population density core city area and the industrial zone receiving the most reliable service. 22 references.","PeriodicalId":177728,"journal":{"name":"The Bell Journal of Economics","volume":"94 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1979-01-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"137","resultStr":"{\"title\":\"Economic criteria for optimizing power system reliability levels\",\"authors\":\"M. Munasinghe\",\"doi\":\"10.2307/3003337\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A generalized simulation model for optimizing the reliability level of electrical supply is described. The model is applied to a case study of Cascavel, Brazil to determine a range of optimum reliability levels for long range electric power distribution system planning. The basis of the model is its comparison of the social benefits and costs of changes in power system reliability. The supply side costs of increasing system reliability can be determined from straight forward engineering considerations. On the demand side, the benefits of electricity users consist of cost savings from averted power failures or outages, which may be measured by the disruption of the output streams owing to idle input factors and spoilage. The results of the Cascavel case study indicate that the principal outage costs are incurred by industrial and residential consumers. This fact is reflected in the optimum design of the distribution system, with the high population density core city area and the industrial zone receiving the most reliable service. 22 references.\",\"PeriodicalId\":177728,\"journal\":{\"name\":\"The Bell Journal of Economics\",\"volume\":\"94 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-01-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"137\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Bell Journal of Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2307/3003337\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Bell Journal of Economics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2307/3003337","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 137

摘要

提出了一种优化供电可靠性水平的通用仿真模型。将该模型应用于巴西卡斯卡维尔的一个案例研究,以确定长距离配电系统规划的最佳可靠性水平范围。该模型的基础是对电力系统可靠性变化的社会效益和成本进行比较。提高系统可靠性的供给侧成本可以从直接的工程考虑中确定。在需求方面,电力用户的利益包括避免电力故障或中断而节省的成本,这可以通过由于闲置投入因素和损坏而导致的输出流中断来衡量。Cascavel案例研究的结果表明,主要的停电成本是由工业和居民消费者承担的。这一事实体现在配电系统的优化设计上,人口密度高的核心城区和工业区得到最可靠的服务。22日引用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Economic criteria for optimizing power system reliability levels
A generalized simulation model for optimizing the reliability level of electrical supply is described. The model is applied to a case study of Cascavel, Brazil to determine a range of optimum reliability levels for long range electric power distribution system planning. The basis of the model is its comparison of the social benefits and costs of changes in power system reliability. The supply side costs of increasing system reliability can be determined from straight forward engineering considerations. On the demand side, the benefits of electricity users consist of cost savings from averted power failures or outages, which may be measured by the disruption of the output streams owing to idle input factors and spoilage. The results of the Cascavel case study indicate that the principal outage costs are incurred by industrial and residential consumers. This fact is reflected in the optimum design of the distribution system, with the high population density core city area and the industrial zone receiving the most reliable service. 22 references.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信