备件服务措施对前端晶圆生产过程性能的影响

Douniel Lamghari-Idrissi, Daniel Soellaart, R. Basten, N. Dellaert
{"title":"备件服务措施对前端晶圆生产过程性能的影响","authors":"Douniel Lamghari-Idrissi, Daniel Soellaart, R. Basten, N. Dellaert","doi":"10.1109/WSC40007.2019.9004919","DOIUrl":null,"url":null,"abstract":"We are interested in the influence of spare part service measures on the performance of front-end wafer fabrication process. This process is characterized by re-entrant flows exacerbating variability differences. We focus on the bottleneck resource. First, we simulate the spare part supply chain to show the impact of the spare part service measures on the time to repair distribution. Second, we use this distribution to assess the performance of the front-end wafer fabrication process. We conclude that the choice of the spare parts service measure has a high impact on the front-end wafer fabrication process performance. Our methodology could help practitioners making improved decisions regarding spare parts service measure.","PeriodicalId":127025,"journal":{"name":"2019 Winter Simulation Conference (WSC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Influence of Spare Parts Service Measures on the Performance of Front-End Wafer Production Process\",\"authors\":\"Douniel Lamghari-Idrissi, Daniel Soellaart, R. Basten, N. Dellaert\",\"doi\":\"10.1109/WSC40007.2019.9004919\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"We are interested in the influence of spare part service measures on the performance of front-end wafer fabrication process. This process is characterized by re-entrant flows exacerbating variability differences. We focus on the bottleneck resource. First, we simulate the spare part supply chain to show the impact of the spare part service measures on the time to repair distribution. Second, we use this distribution to assess the performance of the front-end wafer fabrication process. We conclude that the choice of the spare parts service measure has a high impact on the front-end wafer fabrication process performance. Our methodology could help practitioners making improved decisions regarding spare parts service measure.\",\"PeriodicalId\":127025,\"journal\":{\"name\":\"2019 Winter Simulation Conference (WSC)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 Winter Simulation Conference (WSC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/WSC40007.2019.9004919\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 Winter Simulation Conference (WSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/WSC40007.2019.9004919","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

我们感兴趣的是备件服务措施对前端晶圆制造过程性能的影响。这一过程的特点是可重新进入的流动加剧了可变性差异。我们专注于瓶颈资源。首先,对备件供应链进行仿真,分析备件服务措施对维修时间分布的影响。其次,我们使用这种分布来评估前端晶圆制造工艺的性能。我们得出结论,备件服务措施的选择对前端晶圆制造工艺性能有很大的影响。我们的方法可以帮助从业者对备件服务措施做出改进的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Influence of Spare Parts Service Measures on the Performance of Front-End Wafer Production Process
We are interested in the influence of spare part service measures on the performance of front-end wafer fabrication process. This process is characterized by re-entrant flows exacerbating variability differences. We focus on the bottleneck resource. First, we simulate the spare part supply chain to show the impact of the spare part service measures on the time to repair distribution. Second, we use this distribution to assess the performance of the front-end wafer fabrication process. We conclude that the choice of the spare parts service measure has a high impact on the front-end wafer fabrication process performance. Our methodology could help practitioners making improved decisions regarding spare parts service measure.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信